London Underground Limited
Buyer information published with procurement notices.
- Published identifier
- GB-COH 01900907
- Address
- London, UKI41, E20 1JN, United Kingdom
- First notice
- 22 Jan 2025
- Latest notice
- 30 Sept 2026
Published procurement activity · 41 tenders
Buyer information published with procurement notices.
Replacement of Track to Train (One Person Operation (OPO)) CCTV System Partial Replacement for Jubilee Line Fleet (96TS)
This procurement is for the Supply of door components for the Central Line tube stock The package includes: Stiffener Door Seals - Total: 1,700 Assemblies Components fitted at the bottom section of the door seal to provide stiffness and support door closure. Shaft support Brackets - Total: 789 Assemblies Brackets fitted in the d
This procurement is for the overhaul of internal doors of the Jubilee line. These services and parts being procured are partial replacement of the existing ones as confirmed by the conditional assessment completed in 2024.
Transport for London (TfL) is exploring a full replacement of the Passenger Information System (PIS) on the Victoria Line to address obsolescence and improve long term supportability. With this exercise TfL would like to understand supplier capability and delivery approaches for a modern PIS that is like for like with the existi
The scope of materials to be procured is clearly defined in a Bill of Materials (BoM) prepared by LUL Engineering, covering 69 trains, including 2 spares. The BoM has been grouped into three (3) Lots to facilitate easier tracking, planning and procurement as follows: • Bespoke Electronic Communications Network (ECN) Harnesses
This procurement is for the supply of door parts such as electrical motor, wiring chains, cables, driving screws, and seals from original equipment manufacturer (OEM) Wabtec, for the overhaul of the Metropolitan line doors project. The parts being procured are partial replacement of the existing ones as confirmed following the c
Supply of Power Axles for the Victoria Line Heavy Overhaul Planned Lift (HOPL). Parts to be delivered; Power Axle Gearbox x 71 Power Axle Shoegear x72
London Underground is looking to improve the current level of security on the 09TS fleet on the Victoria Line by addressing the on-train CCTV System ongoing reliability and obsolescence issues. Focusing on a complete system replacement including: Replacement of DVRs and cameras with new & redesigned modules. Replacement of all w
Supply of 197 of Anti-Roll Bar Kits for the S7 Overhaul Programme Lift.
Supply of Over Height Valves which will be fitted to the fleet . This requirement is to provide the material only and the overhaul will be carried out by Depot Engineering.
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.