BEDFORDSHIRE HOSPITALS NHS FOUNDATION TRUST
Buyer information published with procurement notices.
- Published identifier
- Not supplied
- Address
- Luton, UKH21, LU40DZ, United Kingdom
- First notice
- 14 Mar 2025
- Latest notice
- 24 Sept 2026
Published procurement activity · 30 tenders
Buyer information published with procurement notices.
The project involves the supply and installation of new doors throughout Oak and Cedar wing within the new Building at Luton and Dunstable University Hospital NHS Foundation Trust, together with modifications to existing doors to convert them from double-swing to single-swing operation. The door replacements are required to faci
Decoration to Consultation rooms, overhaul existing single glazed windows. Ensuring extract fans are working. Replacing non compliant wash hand basins. Replacing existing Reception desk. For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Luton:-Constr
Bedfordshire Hospitals NHS Foundation Trust requires the replacement of failed chillers serving Pathology (Building 48/64) and Theatres 3 & 4 (Building 39). The project has been expanded to include increased cooling capacity and the formation of a fully interconnected chilled water network to enhance resilience for critical clin
Bedfordshire Hospitals are looking to award a supplier to install and maintain a new temperature monitoring system within our pharmacy departments across both Sites, Luton & Dunstable Hospital and Bedford Hospital. We are seeking a comprehensive temperature monitoring system capable of recording ambient, refrigerator, and freeze
Bedfordshire Hospitals NHS Foundation Trust is seeking to appoint a supplier for the provision of Low Lead aprons, associated accessories, and suitable storage solutions for use within its Vascular Theatres, as detailed in Appendix 1 (Costings Sheet). The requirement includes, but is not limited to, 0.35mm Pb equivalent double-
Supply and installation of one new ultra-low noise air-cooled chiller (circa 240kW) on a purpose-built gantry. To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=1005211713
The Trust requires a full replacement of the access control and CCTV systems at Bedford Hospital South Wing. The Trust will progress with replacement of the access control system in the first instance and follow on with CCTV (subject to Capital). The project shall be carried out in a phased manner in agreement with the Trust, as
Bedfordshire Hospitals NHS Foundation Trust proposes to replace, refurbish, and extend the pneumatic tube system at Bedford Hospital to provide a safe, reliable, and future-proofed clinical transport system. The upgraded system will support the rapid movement of clinical specimens, documents, and small items between departments,
The Works comprise the full design, supply, installation, testing, commissioning, and handover of a replacement water softening plant and reverse osmosis (RO) plant, together with all associated pipework alterations, valves, controls, and ancillaries, to achieve full operational integration with the existing HSSD infrastructure.
The Trust requires a full replacement of the HSSD Air Handling Unit (AHU), the associated roof-mounted chiller, and the Low Voltage (LV) panel serving this system. The works include the safe isolation, removal, installation, testing, commissioning, and integration of all new plant and controls to ensure resilient, compliant, and
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.