Opportunity overview
Bedfordshire Hospitals NHS Foundation Trust requires the replacement of failed chillers serving Pathology (Building 48/64) and Theatres 3 & 4 (Building 39). The project has been expanded to include increased cooling capacity and the formation of a fully interconnected chilled water network to enhance resilience for critical clinical services. All works must be undertaken within a live acute hospital environment without disruption to critical cooling services. The project will be delivered within a live acute hospital environment, requiring careful planning, phased installation, and close coordination with clinical services. The system will be procured as a specialist contractor-designed solution, based on a performance specification, with full responsibility for detailed design, installation, testing, commissioning, and handover. For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Luton:-Cooling-and-ventilation-equipment./XX7BP6P3R5 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/XX7BP6P3R5
Classification
- CPV42500000 — Cooling and ventilation equipment
- CPV45331200 — Ventilation and air-conditioning installation work
- CPV45331230 — Installation work of cooling equipment
Lots
- Lot 1£700k
Documents and notices
- Tender notice on Find a TenderOpen source ↗