The trailers have to meet the following capabilities: a) Ground Clearance >150mm b) Steering Angle Requirement > +/-13º c) Load bed length 12180mm d) Load capacity 70ton e) Dead weight 11ton max f) Central Lubrication g) Solid Tyres
The enabling works consist of the installation of new below ground utility ducting; new fire water pipework; new fire hydrants; and new drainage pipework along with associated access chambers. Additionally, existing electrical services and equipment will be diverted/relocated including an existing feeder pillar; an electric vehi
This document is issued as part of the Request for Information (RFI) / Pre-Qualification Questionnaire (PQQ) stage and seeks to obtain information from suitably qualified suppliers for the design, supply, installation, commissioning, and warranty provisions for the Structured Cabling System (SCS), including the following: ▪ OS2
The BOXBAY Works at the existing MT Park area of London Gateway comprise the demolition of existing below-ground services and the construction of the substructure, superstructure and associated infrastructure required to deliver the BOXBAY automated high-bay empty container storage facility. The works will be undertaken within t
London Gateway Port requires catering services to provide its staff and visitors with breakfast, lunch and snack offerings across its shifts that operate 24/7. There are 2 main sites where the provider will operate from, the corporate office building, No.1 London Gateway which has a bistro style offering serving office-based col
London Gateway (LGW) is planning to develop a container storage yard at London Gateway Port. The yard is located at Berth 5 of the Port. The Works include, but are not limited to, the following elements for the construction of 10 ASC modules on Berth 5 Yard, which are split between works designed by the Employer and works to be
DP World is undertaking the expansion of its London Gateway Port facility at Stanford le Hope, through the development of a new second rail terminal located to the west of the existing eastern operational rail facility. This investment will significantly increase the port's rail freight capacity, improve operational resilience,
London Gateway has expansion plans recently backed by a billion-pound investment from DP World, along with various government backed initiatives to develop the surrounding area. For example the creation of the Thames Freeport zone to attract transient trade through the UK etc. The existing Motorola system is no longer sufficient
Purchase of 100 heavy duty container cassettes for London Gateway Port a) Weight of Heavy-Duty Cassettes (Max 4500kg) b) Load capacity (max 62,000 kg) c) Dimensions : Overall width (2,800 mm) - Overall length 12,350 mm) - Overall height (1,600 mm) d) Height of landing plates for container corner casts (1,300 mm) e) Design to all
To ensure deep draft vessels can continue to access London Gateway Port, Maintenance Dredging of the part of the Navigation Channel and berth pocket is required. The Works require dredging at areas within the Yantlet (Sea Reach and Manoeuvring Area), areas at the Sunk, areas in Knock John Channel together with the removal of hig
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.