Home / Opportunities / Opportunity
PROCUREMENT OPPORTUNITY

MNI Phase 1 Design

Merseytravel · award, contract

Tender information last checkedLast checked 14 Oct 2026, 13:31.

Opportunity overview

To provide services to support the Early Contractor Involvement (ECI)

Awarded to

Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.

Mott MacDonald Ltd

Matched by number
Contract value
£119.6k
Awarded
Not supplied
Contract signed
16 Aug 2026
Award ID
096946-2026-1
Status
active
Identifier
GB-COH 1243967
Location
London, UK, United Kingdom

Classification

  • CPV71311000 — Civil engineering consultancy services

Lots

  • The scope of the works is to cover the additional technical services necessary by the appointed designer in developing the pre-construction design and scope in conjunction with the main contractor.Value not stated

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
ocds-h6vhtk-078769
Status
complete
Main Procurement Category
services
Procurement Method
limited
Procurement Method Details
Award procedure without prior publication of a call for competition
Why this procedure was chosen
The initial contract was procured and awarded pursuant to the requirements of the Public Contracts Regulations 2015 ('PCR 2015'). The PCR 2015 provide exemptions under which a contract may be compliantly modified without a new procurement procedure. The original contract has previously been modified twice, a further modification would not be permitted as this would take the total modified cost to over 50% of the original contract value. The predominant cause of the increase in work required under the contract is due to the Combined Authority agreeing to undertake the public realm improvements at Monument Place that were proposed to be undertaken by Liverpool City Council. There is public benefit in doing so due to cost efficiencies and reduced public disruption. Consideration has been given to alternative arrangements but the proposed additional work cannot be easily discoupled from existing work. A new tender process is not feasible in the circumstances. Officers believe that failing to undertake an ECI stage will create a significant risk to the deliverability of the Project given the budget difficulties it already faces.

Legal basis

Id
32014L0024
Scheme
CELEX

Classification

Scheme
CPV
Id
71311000
Description
Civil engineering consultancy services

Covered By

GPA

Procedure reasons

Entry 1
Scheme
TED_PT_AWARD_CONTRACT_WITHOUT_CALL
Id
D_OUTSIDE_SCOPE
Description
The procurement falls outside the scope of application of the directive

Lots and requirements

Entry 1
Id
1
Description
The scope of the works is to cover the additional technical services necessary by the appointed designer in developing the pre-construction design and scope in conjunction with the main contractor.
Has Options
No

Items and delivery

Item 1
Id
1
Related Lot
1

Delivery locations

Entry 1
Region
UKD7

Buyer, suppliers and contacts

Organisation 1
Name
Merseytravel
Id
GB-FTS-187559

Identifier

Legal Name
Merseytravel
No Identifier Rationale
notOnAnyRegister

Address

Street Address
1 Mann Island
Locality
Liverpool
Region
UKD72
Postal Code
L31BP
Country Name
United Kingdom

Contact

Name
Carol Glover

Roles

buyer

Details

Classifications

Entry 1
Scheme
TED_CA_TYPE
Id
REGIONAL_AUTHORITY
Description
Regional or local authority
Entry 2
Scheme
COFOG
Id
01
Description
General public services
Organisation 2
Name
Mott MacDonald Ltd
Id
GB-COH-1243967

Identifier

Legal Name
Mott MacDonald Ltd
Id
1243967
Scheme
GB-COH

Address

Locality
London
Region
UK
Country Name
United Kingdom

Roles

supplier

Details

Scale
large
Organisation 3
Name
The High Court
Id
GB-FTS-495

Identifier

Legal Name
The High Court

Address

Locality
London
Country Name
United Kingdom

Roles

reviewBody

Award information

Award 1
Id
096946-2026-1
Status
active

Related lots

1

Suppliers

Supplier 1
Id
GB-COH-1243967
Name
Mott MacDonald Ltd

Contracts and changes

Entry 1
Id
096946-2026-1
Award ID
096946-2026-1
Status
active
Date Signed
17 Aug 2026, 00:00

Value

Amount
119,638.97
Currency
GBP

Recorded locations

  • Buyer location · Liverpool · UKD72 · L31BP · United Kingdom
  • Delivery location · UKD7

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. 096946-2026award, contract ·

PROCURAAXIS AWARD ANALYSIS

Award outcome intelligence

Evidence-bound analysis of the published award appears below the official tender and award information.

ANALYSIS PREVIEW

Award intelligence at a glance

Merseytravel awarded MNI Phase 1 Design services to MOTT MACDONALD LIMITED. The notice records a GBP 119,638.97 contract signed on 17 August 2026 for additional technical design services supporting early contractor involvement and pre-construction development.

Published outcome signals

  • Notice statusComplete; displayed as awardedEvidence: Process source_status is "complete", display_status is "awarded", and notice tags are award and contract.
  • Award statusActiveEvidence: Award 096946-2026-1 has status "active".
  • Contract statusActive; signedEvidence: Contract 096946-2026-1 has status "active" and dateSigned of 2026-08-17.
97% approved-analysis confidence1 supplier record analysed3 source limitations

SOURCE AND FRESHNESS

Traceable procurement data

Source
Find a Tender
Notice reference
096946-2026
OCID
ocds-h6vhtk-078769
First published
14 Oct 2026
Last checked
14 Oct 2026, 13:31
Notice versions reviewed
1

HOW THIS WAS PREPARED

Approved, evidence-bound analysis

ProcuraAxis structures information found in published procurement records, checks the result for consistency and publishes only approved analysis. Confidence describes the completeness and consistency of the available source information; it is not a guarantee of eligibility or contract award.

Analysis status
Approved for publication
Analysed
14 Oct 2026
Read the analysis methodology →