East West Rail - Further Critical Works

NETWORK RAIL INFRASTRUCTURE LIMITED · Transparency notice on Find a Tender

Tender information last checkedLast checked 14 Oct 2026, 08:51.

Opportunity overview

The requirement consists of a combination of design services and construction works which are needed to increase the rail network’s operational capacity for progressive delivery of benefits from early 2030s and to support the rail networks’ early operational response to a new theme park which is set to open in 2031. The indicative high-level scope relating to this transparency notice refers only to the Marston Vale Line between Bletchley and Stewartby, and on the OXD line between Oxford Parkway and Bletchley, and Milton Keynes Central Station design services and works (subject to funding and any other required internal and external approvals): - Undertaking the design for critical rail systems upgrade and required station packages on the Martson Vale and OXD lines to support a higher capacity railway as far as Stewartby. - Re-signalling works, track upgrades including double tracking between Bletchley and Fenny Stratford and a new layout at Stewartby, passing loops, electrification, level crossing closures, bridge and underpass works, station works at Winslow, Bletchley and Stewartby, earthworks and drainage resilience. - Discharge of new planning consents under the EWRco Development Consent Order (DCO) and integration with TWAO conditions and commitments in support of the delivery of the Marston Vale Line Core Works (MVLCW). - Delivery of enabling works such as site clearance, compound set up, Flood Storage Areas (CFSA), Environmental Compensation Sites (ECS) and utility diversions - Integration of timetabling modelling between MVLCW and this scope. This includes both service outcomes and temporary arrangements including possession planning. It is currently anticipated, based on the current information, that the estimated final costs of these works and services will amount to a maximum of £650m (excluding VAT). This scope of this Transparency Notice does not include several of the final station arrangements on the Martson Vale signalling area, or the option for a train maintenance depot on the OXD lines. The requirements for this will be procured separately. Information on the wider East West Rail project can be found at East West Rail | Project overview. The in scope design services and works will require significant coordination and integration with the ongoing works currently being delivered by the East West Rail Alliance (EWRA) on the Marston Vale Line, referred to as the Marston Vale Line Core Works (MVLCW). This includes design integration, as well as the management and delivery of the works on the same site, at the same time and, on the same rail systems, therefore Network Rail consider this an extension of existing work. An overview of the existing MVLCW scope includes: - Multiple level crossing closures and bridge work (including BF01) on the Marston Vale Line - Signalling and control system alterations associated with level crossing works and associated track works - Other coordinated bridge works - Timetable development works - Options for safety enhancements at stations including tactile edges, extension of existing station lighting, announcement, wayfinding and customer information systems if required - Resilience infrastructure works including track, drainage and earthworks

Awarded to

Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.

Atkins Realis UK Limited

Matched by number
Shared published award value
£650m
Awarded
Not supplied
Suppliers
One of 3 awarded suppliers
Award ID
1
Status
pending
Identifier
GB-COH 00688424
Location
Epsom, UKJ26, KT18 5BW, United Kingdom
Shared published award value
£650m
Awarded
Not supplied
Suppliers
One of 3 awarded suppliers
Award ID
1
Status
pending
Identifier
GB-COH 04309402
Location
Dartford, UKJ43, DA2 6SN, United Kingdom

VolkerRail Limited

Matched by number
Shared published award value
£650m
Awarded
Not supplied
Suppliers
One of 3 awarded suppliers
Award ID
1
Status
pending
Identifier
GB-COH 03184313
Location
Hoddesdon, UKH23, EN11 9BX, United Kingdom

Classification

No classification was supplied.

Lots

  • Lot 1Value not stated

Documents and notices

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
ocds-h6vhtk-078703
Status
complete
Procurement Method
direct
Procurement Method Details
Direct award
Why this procedure was chosen
Engaging a supplier other than the East West Rail Alliance (EWRA) for this requirement, which is an extension of ongoing design services and works, would result in Network Rail receiving works and services which are different from and/or incompatible with those currently being developed and integrated with the MVLCW, and that incompatibility would result in disproportionate technical difficulties: - The design services and works are an extension of ongoing MVLCW design development, access planning, consents, staging, timetable modelling, train path development, rail access strategy, rail signalling systems design, closure strategy, and physical interface management across the Marston Vale corridor and, they depend on continuous integration of the existing works and the required works which are the subject of this Notice. Given the overlapping design and delivery timeframes between the existing requirements and the new work, the remit requires integration of the MVLCW delivery plan with the wider railway works to minimise technical incompatibility, achieve design integration and manage delivery risks through interface studies, constructability validation, and coordinated staging plans. The difference in timing and compatibility would create disproportionate technical difficulties for Network Rail to manage. The network requires a near-term operational response to address network demand and without the successful completion and efficient integration of this work Network Rail would be required to operate a railway through a period of sharply increased demand without the planned capacity, service uplift, staging logic and supporting infrastructure. - A new supplier would necessarily introduce different programme assumptions, design integration processes, interface management arrangements, and delivery sequencing. In practice, a separate supplier stepping into this live, interdependent delivery environment to coordinate effectively with the existing MVLCW supplier would create major interface risk, duplication of effort, resource and cost, delay in decision-making, and loss of programme efficiency. This would include duplication in critical documents such as WPP, CDM plan and engineering management plans which would be disproportionately inefficient and import more risks and complexities as well as additional overarching integration documents and additional duties. For engineering assurance, this would result in extensive progressive assurance plans, due to designs being developed at different stages and multiple design logs and risk assessments. With a new supplier, Network Rail would introduce higher safety and technical risks where two different suppliers are working in the same geographic area and delivering scope which cannot clearly separate the responsibilities and accountabilities for each supplier. The EWRA is already embedded in that interface and through asset protection design reviews and is therefore providing an integrated planning capability that would be difficult and inefficient to replicate through an additional supplier. - A change in supplier would introduce non-compatibility between the current MVLCW BFO1B track restoration work and final state BFO1B to Fenny Stratford double tracking work. This incompatibility would lead to abortive works. With respect to signalling design, a new supplier would either introduce duplication of and inconsistent design parameters for alteration to signalling interlocking and control systems between current level crossing work and the scoped relock and recontrol of signalling systems or be solely reliant on a multi stage approach involving abortive works and unnecessary staging. Any overlapping design agreement for major signalling work – including the design, construction and testing with re-signalling, recontrols and relocking’s would cause disproportionate difficulties for Network Rail. Any risk delay to achieving the MVLCW works would also delay the enabling design, consents, seasonal works, access arrangements and physical interfaces on which the railway enhancements depend - A different contractor would introduce the risk of delay to the new works and MVLCW itself caused by the overlap in design, planning arrangements and approvals from common interfacing parties and technical difficulties would arise because Network Rail would also be without the enabling works needed to support efficient construction, coordinated possessions, and the transition into the later access, closure and upgrade phases. That would create significant operational stress, including constrained timetable options, reduced resilience during disruption, greater pressure on existing stations and route interfaces, and increased complexity in maintaining assets while preserving future compatibility with the later Marston Vale interventions. It would also increase the risk of repeated access to the railway, abortive or duplicated works, and inefficient maintenance of assets that were intended to be altered, relocated or integrated through MVLCW and the follow-on enhancements.

Legal basis

Id
2023/54
Scheme
UKPGA

Special regime

utilities

Procedure reasons

Entry 1
Id
additionalRepeatExtensionPartialReplacement

Lots and requirements

Entry 1
Id
1
Status
complete

Published documents

Entry 1
Id
conflictOfInterest
Document Type
conflictOfInterest
Description
Not published

Buyer, suppliers and contacts

Organisation 1
Name
NETWORK RAIL INFRASTRUCTURE LIMITED
Id
GB-PPON-PNZN-9524-VCQJ

Identifier

Scheme
GB-PPON
Id
PNZN-9524-VCQJ

Address

Street Address
Waterloo General Office
Locality
London
Postal Code
SE1 8SW
Country
GB
Country Name
United Kingdom
Region
UKI45

Contact

Name
Darren Cooper
Telephone
+447795688635

Roles

buyer

Details

Classifications

Entry 1
Scheme
UK_CA_TYPE
Id
publicAuthorityCentralGovernment
Description
Public authority - central government
Organisation 2
Name
Atkins Realis UK Limited
Id
GB-COH-00688424

Identifier

Scheme
GB-COH
Id
00688424

Address

Street Address
Woodcote Grove, Ashley Road
Locality
Epsom
Postal Code
KT18 5BW
Country
GB
Country Name
United Kingdom
Region
UKJ26

Contact

Roles

supplier

Details

Scale
large
Vcse
No
Organisation 3
Name
Laing O'Rourke Delivery Limited
Id
GB-COH-04309402

Identifier

Scheme
GB-COH
Id
04309402

Address

Street Address
Bridge Place Anchor Boulevard, Admirals Park Crossways
Locality
Dartford
Postal Code
DA2 6SN
Country
GB
Country Name
United Kingdom
Region
UKJ43

Contact

Roles

supplier

Details

Scale
large
Vcse
No
Organisation 4
Name
VolkerRail Limited
Id
GB-COH-03184313

Identifier

Scheme
GB-COH
Id
03184313

Address

Street Address
Hertford Road
Locality
Hoddesdon
Postal Code
EN11 9BX
Country
GB
Country Name
United Kingdom
Region
UKH23

Contact

Roles

supplier

Details

Scale
large
Vcse
No

Award information

Award 1
Id
1
Status
pending
Main Procurement Category
works
Above Threshold
Yes

Items

Item 1
Id
1
Related Lot
1

Additional Classifications

Entry 1
Scheme
CPV
Id
45000000
Description
Construction work

Delivery locations

Entry 1
Region
UK
Country
GB
Country Name
United Kingdom

Value

Including VAT
780,000,000
Amount
650,000,000
Currency
GBP

Suppliers

Supplier 1
Id
GB-COH-00688424
Name
Atkins Realis UK Limited
Supplier 2
Id
GB-COH-04309402
Name
Laing O'Rourke Delivery Limited
Supplier 3
Id
GB-COH-03184313
Name
VolkerRail Limited

Contract period

Starts
9 Nov 2026, 00:00
Ends
24 Nov 2036, 23:59

Related lots

1

Documents

Entry 1
Id
096761-2026
Document Type
awardNotice
Notice Type
UK5
Description
Transparency notice on Find a Tender
Published
14 Oct 2026, 07:22
Format
text/html

Milestones

Entry 1
Id
1
Type
futureSignatureDate
Due
4 Nov 2026, 23:59
Status
scheduled

Recorded locations

  • Buyer location · London · UKI45 · SE1 8SW · United Kingdom

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. 096761-2026Transparency notice on Find a Tender ·

PROCURAAXIS AWARD ANALYSIS

Award outcome intelligence

Evidence-bound analysis of the published award appears below the official tender and award information.

ANALYSIS PREVIEW

Award intelligence at a glance

Network Rail Infrastructure Limited has published a transparency notice for a proposed direct award to the East West Rail Alliance suppliers: ATKINSRÉALIS UK LIMITED, LAING O'ROURKE DELIVERY LIMITED and VOLKERRAIL LIMITED. The pending award covers further critical rail design and construction works on the Marston Vale and OXD lines, with a stated maximum value of £650 million excluding VAT.

Published outcome signals

  • Notice typeTransparency notice on Find a TenderEvidence: The published document is described as a "Transparency notice on Find a Tender".
  • Award statusPendingEvidence: Award 1 has status "pending".
  • Contract statusNot evidenced as signed or activeEvidence: The award is pending and only a future signature milestone is supplied.
97% approved-analysis confidence3 supplier records analysed3 source limitations

SOURCE AND FRESHNESS

Traceable procurement data

Source
Find a Tender
Notice reference
096761-2026
OCID
ocds-h6vhtk-078703
First published
14 Oct 2026
Last checked
14 Oct 2026, 08:51
Notice versions reviewed
1

HOW THIS WAS PREPARED

Approved, evidence-bound analysis

ProcuraAxis structures information found in published procurement records, checks the result for consistency and publishes only approved analysis. Confidence describes the completeness and consistency of the available source information; it is not a guarantee of eligibility or contract award.

Analysis status
Approved for publication
Analysed
14 Oct 2026
Read the analysis methodology →