The purpose of this work is to act as an independent reviewer for the uncertainty framework currently under development, which will include uncertainty in facility performance including the neutron field that tritium breeding experiments are exposed to, scientific output including the measurement of tritium extracted from experi
The fit out of C8 is being designed by AtkinsRealis in liaison with both UKAEA and UKIFS for long-term tenanted occupation as part of the site-wide organisation of departmental placement, this is to aid the congregation of teams along with enabling the emptying of other buildings that are ear-marked for future demolition. It is
The scope of the contract includes the supply of five (5) Helium leak detectors for the Hydrogen 3 Advanced Technology (H3AT) facility at the UKAEA’s Culham Campus. The leak detectors will be utilized within H3AT project to confirm/test the leak rate of systems during installation and commissioning phase.
The supply of flexible hoses for incorporation into the cryopump assembly being manufactured and tested under an existing contract. The hoses will be welded into the assembly and then undergo pressure testing as part of the Factory Acceptance Tests under the main contract.
The required works are for a feasibility study into an upgrade of the J52 power supplies, supplied and commissioned by JEMA, which will be repurposed for the MAST-U D15 project. The study will determine the technical and practical requirements for optimising the power supplies to operate within MAST-U parameters. This activity i
The refurbishment work required involves: 1. Design a HV bushing compartment box to be made to suit the existing D8 10 MVA transformer on site 2. Draining of the oil in the bushing compartment 3. Replace the existing bushing compartment with this new box 4. Replace the HV bushing terminals 5. All installation activities associat
IT Cabling - UKAEA Culham Site. Constant office refurbishments and new installation requests involve installing new cables and removing existing obsolete cabling alongside with the existing data and power infrastructures. Any new complex builds e.g. a new building requires end-to-end involvement from a data contractor and includ
The UK Atomic Energy Authority has a requirement for the Inspection and Maintenance of its Workshop Equipment across its Culham Campus site in Oxfordshire.
Develop and test tools and solutions to scabble/ shave/plane brick and concrete walls by remote operation with the primary focus on brick walls. The requirement is to remove 5mm of the surface of the walls in localised areas and capture (vacuum or similar) any loose material from the scabbling/shaving process
Recently developed equipment and solution that will provide 4G and eventually 5G mobile network services on private land and internally into buildings with little or no mobile signal. Culham Campus has poor signal quality, and this solution aims to provide improved coverage externally and inside the main C11 security reception.