Royal Holloway and Bedford New College
Buyer information published with procurement notices.
- Published identifier
- GB-COH RC000823
- Address
- Egham, UKJ25, TW20 0EX, United Kingdom
- First notice
- 15 Apr 2025
- Latest notice
- 20 Oct 2026
Published procurement activity · 109 tenders
Buyer information published with procurement notices.
This work has been identified as essential maintenance following an annual condition surveys. The scope of work includes repairs to cracked mortar and brickwork, weathered brick facings, insecure cowlings, and corroded metal bands. These remedial works are necessary to maintain the chimneys in a safe condition and to prevent fur
The proposed works comprise the internal refurbishment and lighting upgrade of the Gymnasium. The refurbishment includes full redecoration of the gymnasium, including ceiling and alcove finishes, installation of aluminium chequer plate wall protection, and the construction of wall units to conceal electrical service boards. The
In line with the University's Sustainability Strategy, Carbon Reduction commitments, and Green Travel Plan objectives, the University is seeking to expand its EV charging infrastructure to support this transition and encourage lower-emission travel choices. The University's Egham campus currently has provision four (4) dual-sock
Awarded to IPSOS (Market Research) Ltd for Procurement of surveys across the world following request for quotations.
Awarded to Tri Project Construction Limited following request for quotations for refurbishment of the accessibility ramp serving the Founder's Building North Tower.
The refurbishment of the Sports Fitness Suite includes: 1) Scaffolding to wrap the building with three lifts. 2) All repairs and preparation works to road side and path way access side of the building and decorate in colours agreed with the University. 3) Supply and fit two new hopper heads and downpipes. 4) Carry out repairs
This project at Chestnuts involves the remediation of widespread dry rot affecting existing timber floor structures. Due to delays during earlier works, the building became saturated, and despite subsequent enclosure, moisture remained trapped, leading to failure of several timber floors. The works comprise the strip-out of defe
The occupancy level of the University's Founders Main Lecture Theatre has been reviewed by the Health & Safety team. While there are two points of exit from the theatre, the largest exit must be discounted with the width of the remaining exit dictating capacity. The second exit from the Theatre is only 850mm wide which limits ca
This Building Refresh project comprises a multi-site refurbishment programme and an anticipated delivery period of four weeks. The works encompass strip-out, redecoration, flooring and ceiling replacement, and mechanical and electrical upgrades (including LED lighting installations) across several campus buildings.
Window replacement for the Horton Building.
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.