Northern Lighthouse Board (NLB) is looking for a supplier to install a new unlit beacon in the Loch Spelve sea loch on the southeast coast of the Isle of Mull. It will be located in the channel to Loch Spelve at Latitude 56° 23.230’N, Longitude 005° 42.012’W. Brief overview The unlit beacon is a 7.5m high stainless steel pole s
Description of Works Cantick Head Lighthouse is accessed via a privately owned, single-track, unsurfaced road located beyond the end of the B9047 public road on South Walls, Orkney. The road provides the only vehicular route to the lighthouse and adjacent residential properties. The site is operational, with mains power and road
Key Details: •Tender Reference: ENPR/LLHI/2560 •Tender Return Deadline: 23 October 2025 •Site Visit (Mandatory): 14 October 2025 •Expected Start Date: Early December 2025 •Platform: Full details and tender documents will be available via Delta eSourcing. Project Overview: The works will involve minor civil maintenance and the ap
NLB have a requirement to purchase replacement rescue stretcher kits and spinal splints and some additional spinal splints. Amounts are: 16x stretcher kits and 16x spinal splints to replace existing ones that the 10-year lifespan expires in 2026. An additional 12x spinal splints to pair with existing SLIX stretchers that do not
Refurbishment and Upgrade of Dunnet Head Lighthouse The main items of project work are as listed below:- -Carry out a full Asbestos Refurbishment / Demolition Survey on all NLB operational buildings prior to the commencement of any work. The survey, sample collection and sample analysis must be carried by a UKAS accredited contr
Scope: Fabrication of Unlit Beacon - Loch Spelve We require a skilled fabricator to carry out the scope of works as below •Purchase of fabrication materials •Fabrication of structure •Delivery of structure to NLB Oban Depot Proposed Works Fabricate a 7.5m high x Ø 457mm x 12mm thick Circular Hollow Section (CHS) stainless steel
NLB requires external engineering support to provide technical expertise not available in-house. This includes inspections, feasibility studies, design work, and specialist advice across a wide range of infrastructure projects and maintenance tasks. Services will support the Asset Management and Project Delivery teams by supple
We have a provision of refurbishment of Bass rock lighthouse. This lighthouse is situated on a steep crag on the southern entrance to the Firth of Forth off the east coast of Scotland. The island rises out of the sea to a height of 107 metres and it is about a mile in circumference. It is an important nesting ground for seabirds
Historically, vessels at Oban Base have relied solely on onboard diesel generators while berthed, leading to continued fuel use and associated emissions. There has been no shore power provision in place. The procurement of a cable management system is a strategic requirement, aligned with NLB’s long-term sustainability objective
Requirements NLB have a requirement for a supplier to manage the purchase of various items for our new vessel currently being built in Spain. The Vessel First Fill Spreadsheet provides a full list of all required items; one key aspect is the quality of the products that are offered. NLB are looking for a successful supplier to