MINING REMEDIATION AUTHORITY
Buyer information published with procurement notices.
- Published identifier
- GB-PPON PRPD-5825-QDVY
- Address
- Nottinghamshire, UKF15, NG18 4RG, United Kingdom
- First notice
- 21 Mar 2025
- Latest notice
- 9 Oct 2026
Published procurement activity · 91 tenders
Buyer information published with procurement notices.
The Coal Authority invites you to tender for the provision of wireline geophysical logging services for the Authority in a range of mine shafts and boreholes across the UK on a two year framework agreement with terms based on the Authority's services contract.
Addressing metalliferous diffuse pollution from old, abandoned metal mine sites within UK river catchments is a priority due to the significant environmental impacts associated with the release of harmful diffuse pollutants. These mine sites both leach toxic metals like lead, cadmium and zinc and mobilise heavy metal containing
This contract is for grid upgrade works at Lynemouth MWTS to enable the connection to the grid of the solar PV system that is to be installed over the coming months. These works fall under non-contestable works, which means that the works must be completed by the Distribution Network Operator (DNO), in this instance that is Nort
Material, waste capture and carbon reporting tool. Software as a Service (SaaS).
Planned Preventative Maintenance (PPM) of HVAC systems in the NHS and MHC buildings and all associated kit and machinery, this also includes PPM of 4x LPG boilers in the MHC. The contract price includes a fully comprehensive repair on parts and labour on all assets that BSM carry out Planned Maintenance on, as per the PPM planne
The maintenance contract for the Gas Suppression system and the Fire and Intruder Alarm and Extinguishers.
The Mining Remediation Authority require a LSBUD Membership to enter our pipeline data for one of our sites and any other future works onto their database, as well as joining their utilities protection scheme. The main purpose of this membership is to keep our assets safe and have them logged on a system to avoid any damage to o
SME quote Process - This contract is for the Grounds Maintenance for the Mansfield Headquarters. Mow all grassed areas and remove all grass clippings from site - unless otherwise agreed. The existing grass length should not be reduced by more than half its height at the point of cutting in accordance with good landscape managem
The Mining Remediation Authority (MRA) constructed a Mine Water Treatment scheme to control rising mine water that had been steadily recovering, the outfall from the MWTS is approximately 1km away from the bathing beaches within the North Sea. The provision is for the Supply and installation of the buoy and mooring and all assoc
The Salinity Department are developing a programme of short trails to research technologies which may be of use when seeking solutions to the problems posed by rising saline mine water. Waterwhelm is a start up company based in the UK, Waterwhelm have designed and developed an efficient "Forward Osmosis" technology which has
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.