Aster Group Limited
Buyer information published with procurement notices.
- Published identifier
- GB-COH IP29573R
- Address
- Devizes, UKK15, SN10 2AZ, United Kingdom
- First notice
- 24 Jan 2025
- Latest notice
- 19 Oct 2026
Published procurement activity · 80 tenders
Buyer information published with procurement notices.
Provision of vehicle telematics through real-time tracking, driver behaviour monitoring, and in-depth insights into speeding, harsh braking, acceleration, cornering and idling. By analysing this data, fleet managers can identify areas for improvement, promote safer driving habits, and reduce fuel and maintenance costs. Our solut
Aster Group is undergoing a strategic transformation aimed at enhancing public engagement, improving stakeholder relationships, and increasing visibility across its key housing sectors. As part of this initiative, we require expert PA/PR Consultancy services to support our internal team and boost our communications strategy, man
Design work for RIBA stages 1 to 7 for refurbishment works to Juniper Ct & Forest Ct.
Phase two: Resolve the H&S concern by installing new Tube Clamp handrails to a total of 70 No. the rear balconies located in Banning Street. A pilot project has been successfully completed by Southern Concrete Services Ltd, using a designed solution calculated by JPP Consulting Ltd. (The project is at the request by Test Valley
Refurbish the existing failed front, side/patio & rear concrete footpaths. Build new rear garden retaining walls and install new drainage and soak-aways.
Aster Group maintains approx. 37,000 homes and provides continued investment to its properties where maintenance and replacements may be required. The requirement is for replacement flooring to be fitted in properties comprising of the below addresses, 98-191 Victoria Road, Devizes, Wiltshire, SN10 1EZ.
Venice Court, Roman Way, Andover, SP10 5JQ – Communal areas of walkways/car park – Specialist concrete / masonry works to garage forecourts with associated repairs
Aster Group maintains approx. 37,000 homes and has a legal duty under building safety legislation to ensure fire safety in the common parts of multi-occupied residential buildings. This includes maintaining suitable and sufficient fire risk assessments and implementing remedial actions promptly. The requirement was for FRA remed
Project: The refurbishment of the flat garage roof NB: All roofing work to be carried out by an accredited contractor Erect tubular steel scaffolding with required lifts to such elevations, including suitable access for removing the shared chimney and dismantle on completion. All scaffolding to be measured against the face of
Project: The refurbishment of the main roof NB: All roofing work to be carried out by an NFRC and Garland accredited contractor & must be able to self-certify via the competent roofing scheme or Principal contractor to arrange and pay for a Building Control inspection. As part of contractor pre-survey, contractor should ident
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.