Opportunity overview
Installation of wind bracing to roof structure (trusses). After investigation into structural issues with a number of properties it was discovered that the trusses are missing adequate wind bracing. Demolition and rebuild of gable ends and structural bracing to gable ends as describe in the structural engineer’s reports contained within the tender package. Roof covering replacement where required as stated in structural engineer’s reports. Install wind bracing to all roof trusses following the structural engineer’s reports contained within the specification.Ensure adequate measures where required are implemented where reasonably practicable to reduce the risk of operatives falling through the ceiling finish plus ensuring the safety of any occupants below. Properties will be decanted where required and others will be occupied during the works. The contractor must clean all surrounding areas and all scaffolding, sheeting and rubbish to be removed from site.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Midlands Building & Maintenance Limited
- Contract value
- £331.6k
- Awarded
- Not supplied
- Contract signed
- 21 Sept 2026
- Award ID
- 090186-2026-CAS-01117-Z0Q3L2-1
- Status
- active
- Identifier
- 10941120
- Location
- Tewkesbury, UKK13, GL20 8JG, United Kingdom
Classification
- CPV45260000 — Roof works and other special trade construction works
Lots
- Installation of wind bracing to roof structure (trusses). After investigation into structural issues with a number of properties it was discovered that the trusses are missing adequate wind bracing. Demolition and rebuild of gable ends and structural bracing to gable ends as describe in the structural engineer’s reports contained within the tender package. Roof covering replacement where required as stated in structural engineer’s reports. Install wind bracing to all roof trusses following the structural engineer’s reports contained within the specification.Ensure adequate measures where required are implemented where reasonably practicable to reduce the risk of operatives falling through the ceiling finish plus ensuring the safety of any occupants below. Properties will be decanted where required and others will be occupied during the works. The contractor must clean all surrounding areas and all scaffolding, sheeting and rubbish to be removed from site.Value not stated