Opportunity overview
East Suffolk District Council, West Suffolk Council, Babergh and Mid Suffolk District Council and Ipswich Borough Council are seeking to commission a combined Water Cycle Study. A Water Cycle Study is required to understand the water infrastructure requirements necessary to support growth options in the Local Plans and any implications for the water environment. The Stage 1 study will assess current and future water supply and waste-water capacity, with flood risk management, and drainage issues providing additional useful context. This will assess the broad planned growth in the region up to 2045, with some consideration of further growth up to 2050. Further analysis through Stage 2 will focus on the impact from specific sites/allocations.
Classification
- CPV71311300 — Infrastructure works consultancy services
- CPV71800000 — Consulting services for water-supply and waste consultancy
- CPV90721800 — Natural risks or hazards protection services
Lots
- Lot 1Value not stated · Including VAT · Source currency differs from tender
Documents and notices
- Tender notice on Find a TenderOpen source ↗
- Documents can be found at the above address ITT Part A ITT Part B Appendix A - Specification Appendix B - Draft contractOpen source ↗