PROCUREMENT OPPORTUNITY

Rainwater Management

United Utilities Water Limited · Preliminary market engagement notice on Find a Tender

Tender information last checkedLast checked 26 Sept 2026, 05:42.

Opportunity overview

United Utilities (UU) wishes to engage the market to support the delivery of Rainwater Management schemes across the North West of England. The Environment Act and subsequent Storm Overflow Discharge Reduction Plan (SODRP) have introduced a statutory requirement to significantly reduce the operation of storm overflows, with all storm overflows expected to spill no more than ten times per year by 2050. Approximately 54% of United Utilities' wastewater network is a combined sewer system, conveying both surface water and wastewater to Wastewater Treatment Works (WwTWs) or Combined Sewer Overflows (CSOs) prior to discharge to the environment. This framework will enable United Utilities to appoint Contractors to deliver Rainwater Management solutions that reduce the volume of surface water entering the combined sewer network. Through the implementation of nature-based and sustainable drainage interventions, the framework aims to mitigate the impacts of storm overflows, improve network resilience, and contribute to the achievement of regulatory and environmental objectives. United Utilities’ (UU) Rainwater Management strategy is founded on Sustainable Drainage principles, which prioritise the capture, reuse and management of rainwater as close as possible to where it falls. The strategy promotes the use of surface conveyance, infiltration, disconnection and attenuation to slow the movement of water through the catchment and reduce pressure on the wastewater network. This approach, combined with measures to improve water efficiency, creates additional capacity within wastewater catchments, reduces demand for potable water, and maximises value by delivering wider environmental, social and economic benefits through the creation of blue-green infrastructure. By increasing the use of Rainwater Management interventions, UU can reduce its reliance on traditional, carbon-intensive engineering solutions, such as underground storage tanks, while delivering best value outcomes for customers and the environment. Whilst many of the individual interventions are well-established and proven, the scale and pace of delivery proposed by UU is unprecedented within the sector. The opportunity lies in developing and deploying these solutions at scale, working collaboratively with customers, businesses, Local Authorities, and other key stakeholders to drive widescale delivery and maximise catchment-wide benefits. The current Rainwater Management Programme identifies approximately 6,500 interventions across the United Utilities network area. However, Bidders should note that the programme remains subject to ongoing development and refinement may include up to 10,000 interventions over the framework term. Interventions will be delivered across the five county areas served by United Utilities: Cumbria, Lancashire, Cheshire, Greater Manchester and Merseyside. Particular focus is anticipated within Greater Manchester and Merseyside over AMP8, reflecting the strategic importance of these areas, the presence of Combined Authorities, and the objectives set out within their respective Integrated Water Management Plans (IWMPs). Rainwater Management Intervention Types Attenuation Pond: holding water body, suitable in large natural spaces only Bio-retention: pollution control incorporated into intervention design Blue Roof: smart water storage to catch rainwater and slow the return period Disconnection: surface water systems or extraneous rainwater from the combined network to a more suitable receiver e.g. water course. Downpipe Disconnection: from residential and business buildings, e.g. butt rainwater planter. Filter Drain: trench filled with gravel, water infiltrates to ground Green roofs: water retaining layer beneath a growing medium and planting for additional benefits e.g. air quality, biodiversity. Natural Flood Management (NFM): landscape solutions to manage uplands to retain rainwater where it falls e.g. leaky dams, catchment planting Permeable Paving: water infiltrates to ground or stored/ attenuated underground Rain Garden: surface planting, water infiltrates to ground or stored/ attenuated underground Soakaway: excavation filled with gravel and landscaped. Water infiltrates to ground Swale: shallow wide channel to catch, slow the flow or infiltrate water to ground. Can be wet and/ or dry Tree Pit: underground system combining urban tree planting with drainage that captures stormwater Landscape Maintenance & Management: services to undertake appropriate landscape maintenance such as mowing, watering, visual inspections, re-planting, silt removal. Disconnections Contractors will be responsible for the Design and Build of low complexity surface water disconnection works, where existing surface water pipes connected to the combined sewer network will be diverted to a more suitable receiving system. This may include connection to existing surface water sewers, or discharge via Rainwater Interventions such as rain gardens, attenuation ponds etc. Minor Works Streets Contractors will be responsible for the Design and Build of Rainwater Management interventions located within highways. These will comprise of non-complex standardised design solutions; however, Contractors will be expected to apply appropriate design judgement, innovation and technical capability to adapt solutions to site-specific constraints, stakeholder requirements and opportunities for wider environmental or placemaking benefits. The Contractor will be responsible for managing Traffic Management and gaining the necessary consents/ permits/ license, therefore holding the necessary Street Works Qualifications. In addition, demonstrate the appropriate balance of technical capability and relevant experience to successfully deliver nature-based solutions, encompassing both civil engineering and green infrastructure/landscape expertise. Minor Works – Five S’s Contractors will be responsible for the design and build of Rainwater Management interventions on private sites with a specific focus on schools, supermarkets, stations, state buildings (e.g. hospitals), and social housing sites. Solutions are expected to be low complexity to support delivery at pace and may range from product-based interventions through to bespoke site-specific designs. Contractors will need to consider practical delivery constraints within live environments, such as school playgrounds, supermarket car parks, hospital estates and residential settings. In addition to improving rainwater management, successful solutions should seek to deliver wider social, environmental and community benefits by creating attractive, functional and usable spaces for the people who use them. Examples may include: Interactive and educational outdoor environments for schools Calming and attractive spaces that support wellbeing within healthcare settings Planted areas that improve local amenity and help promote a sense of community within social housing sites Major Works Contractors will be responsible soley for the delivery of the Works (construction) on complex packages comprising of multiple Rainwater Management Interventions across a range of typologies within a single scheme. Interventions may include, but are not limited to, permeable paving, rain gardens, swales, and detention basins. And could be located within highways, public open space, catchment land, public realm. Design services will be provided by others, either by United Utilities' in-house team or by Design Partners appointed through a separate United Utilities framework. The Contractor shall provide suitably qualified and experienced resources with the appropriate balance of civil engineering, green infrastructure, and landscape expertise also managing construction, to support the successful delivery of nature-based solutions in both rural and urban locations. Natural Flood Management (NFM) NFM requires specialist environmental contractors to design and build nature based solutions such as leaky dams, wetlands, earth bunds and catchment planting such as woodland buffer strips or sphagnum moss. Habitat restoration, hydraulic assessment and traditional land management construction capabilities are essential for success. Along with working within designated and highly protected landscapes and with sensitive land owners. Products & Manufacturing Suppliers will be required to manufacture, store, supply, deliver and, where required, install Rainwater Management products suitable for deployment across household and non-household settings. This may include products designed or specified by United Utilities, including those where United Utilities owns or controls the intellectual property, alongside supplier-proposed products or product developments. Products may include, but are not limited to, water butts, rainwater planters, SuDS planters, modular attenuation or storage products, and associated components. Suppliers shall demonstrate the ability of repeatability and delivery at scale in terms of manufacturing, storage, distribution arrangement and installation capability. Also, the ability to deliver in the UU technical, operational and customer environment. Surveys & Investigations Contractor will provide Survey Works to support the delivery of the Rainwater Management Programme. This will include, Topographical, Ground Penetrating Radar (GPR) Drainage (Connectivity, CCTV, MH cards), Impermeable Area Survey (IAS), Contaminated Surface Water (CSW) for cross connections and infiltration tests (BRE 365)

Classification

  • CPV44160000 — Pipeline, piping, pipes, casing, tubing and related items
  • CPV45111240 — Ground-drainage work
  • CPV45220000 — Engineering works and construction works
  • CPV45232450 — Drainage construction works
  • CPV45240000 — Construction work for water projects
  • CPV45262640 — Environmental improvement works
  • CPV71322000 — Engineering design services for the construction of civil engineering works
  • CPV71332000 — Geotechnical engineering services
  • CPV71351500 — Ground investigation services
  • CPV71351810 — Topographical services
  • CPV71630000 — Technical inspection and testing services

Lots

  • Lot LOT-0000Value not stated

Documents and notices

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
PRO005157
Main Procurement Category
works
Above Threshold
Yes
Status
planning

Legal basis

Id
2023/54
Scheme
UKPGA

Additional Procurement Categories

goods

Special regime

utilities

Techniques

Has Framework Agreement
Yes

Communication

Future Notice Date
30 Oct 2026, 23:59

Lots and requirements

Entry 1
Id
LOT-0000
Has Renewal
Yes
Status
planning

Suitability

Sme
Yes

Contract period

Starts
1 Apr 2027, 01:00
Ends
31 Mar 2030, 23:59
Max Extent Date
31 Mar 2035, 23:59

Items and delivery

Item 1
Id
LOT-0000
Related Lot
LOT-0000

Additional Classifications

Entry 1
Scheme
CPV
Id
45232450
Description
Drainage construction works
Entry 2
Scheme
CPV
Id
44160000
Description
Pipeline, piping, pipes, casing, tubing and related items
Entry 3
Scheme
CPV
Id
45111240
Description
Ground-drainage work
Entry 4
Scheme
CPV
Id
45220000
Description
Engineering works and construction works
Entry 5
Scheme
CPV
Id
45240000
Description
Construction work for water projects
Entry 6
Scheme
CPV
Id
45262640
Description
Environmental improvement works
Entry 7
Scheme
CPV
Id
71322000
Description
Engineering design services for the construction of civil engineering works
Entry 8
Scheme
CPV
Id
71332000
Description
Geotechnical engineering services
Entry 9
Scheme
CPV
Id
71351500
Description
Ground investigation services
Entry 10
Scheme
CPV
Id
71351810
Description
Topographical services
Entry 11
Scheme
CPV
Id
71630000
Description
Technical inspection and testing services

Delivery locations

Entry 1
Region
UKD
Country
GB
Country Name
United Kingdom

Planning and budget

Milestones

Documents

Entry 1
Id
075427-2026
Document Type
marketEngagementNotice
Notice Type
UK2
Description
Preliminary market engagement notice on Find a Tender
Published
7 Aug 2026, 16:01
Format
text/html

Buyer, suppliers and contacts

Organisation 1
Name
United Utilities Water Limited
Id
GB-PPON-PVVB-5589-BWHX

Identifier

Scheme
GB-PPON
Id
PVVB-5589-BWHX

Address

Street Address
Lingley Mere Business Park
Locality
Warrington
Postal Code
WA5 3LP
Country
GB
Country Name
United Kingdom
Region
UKD61

Contact

Name
Tesni Walker

Roles

buyer

Details

Classifications

Entry 1
Scheme
UK_CA_TYPE
Id
privateUtility
Description
Private utility

Recorded locations

  • Buyer location · Warrington · UKD61 · WA5 3LP · United Kingdom
  • Delivery location · UKD · United Kingdom

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. 075427-2026Preliminary market engagement notice on Find a Tender ·