Opportunity overview
pumped passive Mine Water Treatment Scheme (MWTS) at the site in Langton to protect and enhance the environment through the control and management of coal mine water and to mitigate the deterioration of water quality and ground water resources. We have completed a compliant Early Contractor Involvement (2 Stage) procurement by conducting mini competition through the Pagabo Civils and Infrastructure Framework Lot 2 Midlands - Water Supply & Waste Water in accordance with Public Contract Regulations 2015 (PCR15). 2-stage procurement approach via the X22 - Early Contractor Involvement (ECI) mechanism through a NEC4 Engineering and Construction Contract. Stage 1 is the pre-construction ECI phase, with development of the scope, detailed design and agreement on price for construction.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
J N Bentley Limited
- Contract value
- £186k
- Awarded
- Not supplied
- Contract signed
- 9 Jul 2026
- Award ID
- 072761-2026-CA18/05841-1
- Status
- active
- Identifier
- GB-COH 01085646
- Location
- Skipton, UK, BD23 2QR, United Kingdom
Classification
- CPV45262640 — Environmental improvement works
- CPV71311300 — Infrastructure works consultancy services
- CPV71313000 — Environmental engineering consultancy services
Lots
- Early Contractor Involvement (2 Stage) procurement by conducting mini competition through the Pagabo Civils and Infrastructure Framework Lot 2 Midlands - Water Supply & Waste Water in accordance with Public Contract Regulations 2015 (PCR15). A 2-stage procurement approach via the X22 - Early Contractor Involvement (ECI) mechanism through a NEC4 Engineering and Construction Contract. Stage 1 is the pre-construction ECI phase, with development of the scope, detailed design and agreement on price for construction. Stage 2 is the construction phase, with completion of any remaining detailed design. The 2-stage approach provided by Option X22 can be used to implement an early supply chain involvement strategy which aligns with 'best practice' guidance set out in the UK government's Construction Playbook (HM Government, 2022).Value not stated