Opportunity overview
The Provider shall carry out the isolation, removal, replacement, installation, testing, and commissioning of mechanical plant and associated services at Barden View Independent Living Scheme. The works shall include, but not be limited to: • Isolation and safe drain down of the existing heating and domestic water systems. • Removal and lawful disposal of the existing boiler, gas-fired hot water cylinder, pumps, and all associated redundant pipework. • Supply and installation of 1 no. I 100kW boiler, including plate-to-plate heat exchanger and associated pipework. • Supply and installation of 1 no. 250-litre unvented hot water cylinder. • Installation of 2 no. pressurisation units serving both boiler and system circuits. • Replacement of expansion vessels. • Supply and installation of new heating and domestic hot water pump sets. • Upgrades to heating controls, including 7-day control panel and associated control systems. • Installation of new safety devices, including gas solenoid valve (emergency shut-off). • Renewal, insulation, and identification of all newly installed pipework in accordance with current standards. • Builder's works including making good and redecoration of plantroom floor and walls following removal of existing plant and flues.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
MAYCO CONSTRUCTION LTD
- Published award value
- Value not stated
- Awarded
- Not supplied
- Contract signed
- 10 Jun 2026
- Award ID
- 1
- Status
- active
- Identifier
- GB-COH 15585134
- Location
- Colne, UKD46, BB8 0BP, United Kingdom
Classification
No classification was supplied.
Lots
- Lot 1Value not stated
Documents and notices
- Contract details notice on Find a TenderOpen source ↗