Opportunity overview
1.2 The requirement consists of: Remove in entirety the existing Basketball post then to supply and install new basketball post Including back boards, nets etc and associated permeable surfacing: • To remove the existing post as identified and the removal of the existing tarmac surfacing. • To supply and install, MUGA including basketball hoop net and football goal, to increase the play value of the current area. • To instal associated permeable surfacing to maximise court performance and drainage • To maintain the council’s high standard of inclusion and creation of a safe play experience for all visitors and users of the site. • Approx. Surface Area: – 310 M/Sq.
Classification
- CPV37535200 — Playground equipment
- CPV43325000 — Park and playground equipment
- CPV45000000 — Construction work
Lots
- Lot 1AED 42k · Source currency differs from tender
Documents and notices
- Tender notice on Find a TenderOpen source ↗