Opportunity overview
1.2 The requirement consists of: • To remove the existing basketball fencing • To remove the existing shelter • Supply and install basketball fencing according to the correct spec and measurements (taking into account taller back fence) along with associated tarmac surfacing. The fencing at the front of the shelter will be removed and replaced with fencing which will now go along the back of the shelter • Supply and install new shelter and associated surfacing • Remove green space next to shelter and extend surfacing / tarmac to cover this area
Classification
- CPV37535200 — Playground equipment
- CPV43325000 — Park and playground equipment
- CPV45000000 — Construction work
Lots
- Lot 1AED 42k · Source currency differs from tender
Documents and notices
- Tender notice on Find a TenderOpen source ↗