Opportunity overview
It is proposed to replace the majority of the PSTN units with new IP-based help points or with existing TVMs retrofitted with help point technology and features. TVMs are all networked devices. The majority of new help points will be connected to the Northern Wide Area Network (WAN) using existing station broadband as part of this scheme. Where it is not possible to replace with IP devices, the help points will be replaced with modern technology GSM units. PSTN help points will be upgraded on a like for like basis using one of the two methods outlined above. This will enable works to progress as maintenance style upgrades without the requirement for design or Network Rail consents and achieve an accelerated delivery programme for completion ahead of PSTN switch off. Contractor is to provide station upgrades and provide Help Point replacements at the locations below: Althorpe, Ashton-under-Lyne, Brinnington, Bryn, Buckshaw Parkway, Crossflatts, Davenport, East Disbury, Gatley, Greenfield, Guide Bridge, Hadfield, Headingley, Heald Green, Levenshulme, Low Moor, Manchester Oxford Road, Marple, Mauldeth Road, Morpeth, Mossley, New Mills Central, New Pudsey, Reddish North, Romiley, Rose Hill, Swinton (Manchester), Thorne North, Westhoughton, Woodhouse
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Picow Engineering Limited
- Contract value
- £182.8k
- Awarded
- Not supplied
- Contract signed
- 14 Jun 2026
- Including VAT
- £219.4k
- Award ID
- 1
- Status
- active
- Identifier
- GB-PPON PCCV-3981-GVHP
- Location
- Cheshire, UKD71, WA7 5TQ, United Kingdom
Classification
No classification was supplied.
Lots
- Lot 1Value not stated
Documents and notices
- Contract details notice on Find a TenderOpen source ↗