Opportunity overview
The build of a new standalone modular Key Stage 2 classroom (or double classroom) at Witheridge C of E Academy with a covered walkway to link back to the main building. - Minimum teaching space of 55m2 (per classroom if double) - 2 Toilets provided, one of which to be disabled - Cloakroom area included in design - Storeroom provision included in design - Covered walkway to link back to the main building - Building works including ground clearance and ground preparation - Survey and design including planning permission and building regulations - Project management costs including technical advice and full CMD. A site visit is available on Thursday 18th June - please contact us via the tender portal to arrange.
Classification
- CPV45000000 — Construction work
Lots
- Lot 1£187k
Documents and notices
- Tender notice on Find a TenderOpen source ↗
- Site Plan - Area marked 5/6 outlined in blue is the site to be developed including the area for the covered walkway to link back to the main building. A site visit is available on Thursday 18th June - please contact us via the tender portal to arrange.Open source ↗
- The tender will be conducted through the PHP Law tendering portal which can be accessed via this link.Open source ↗