Opportunity overview
Pont Segrwyd is in poor condition in certain areas. The south parapet and south spandrel walls are failing and require restoration. There is a crack between the northwest sidewall and the bridge abutment. Other areas on the bridge and adjacent wall are affected by vegetation ingress and loss of pointing. The primary works are: - Take down section of existing south parapet, spandrel wall and northwest sidewall and set aside masonry and stone slabs for reuse. - Vegetation clearance from existing structure. - Rebuild spandrel wall and parapet using existing masonry and stone from local quarry - Repair and repoint remaining sections of bridge parapets, retaining walls and spandrel walls. - Construction of southwest river training wall, repurposing existing stone parapet slabs.
Classification
- CPV14213000 — Macadam, tarmac and tar sands
- CPV44163110 — Drainage pipes
- CPV44163112 — Drainage system
- CPV45000000 — Construction work
Lots
- Lot 1£150k
Documents and notices
- Tender notice on Find a TenderOpen source ↗
- ERCF2509N 14 Pont Segrwyd - Bilingual Sell2WalesOpen source ↗
- ERCF2509N 14 T106 Drainage DetailsOpen source ↗
- ERCF2509N 14 T201 site clearanceOpen source ↗
- ERCF2509N 14 T501 Drainage and DuctsOpen source ↗
- ERCF2509N 14 T601 Prop EarthworksOpen source ↗
- ERCF2509N 14 T701 PavementsOpen source ↗
- ERCF2509N 14 T2401 RepointingOpen source ↗
- ERCF2509N 14 Pont Segrwyd - Volume 2 - CD&QQOpen source ↗
- ERCF2509N 14 BBSOpen source ↗
- ERCF2509N 14 Pont Segrwyd - Volume 1 - ITTOpen source ↗
- ERCF2509N 14 Pont Segrwyd - Volume 3 - DrawingsOpen source ↗
- ERCF2509N 14 Pont Segrwyd - Volume 4 PCIOpen source ↗
- ERCF2509N 14 T101 LPOpen source ↗
- ERCF2509N 14 T102 Exist GAOpen source ↗
- ERCF2509N 14 T103 Exist GAOpen source ↗
- ERCF2509N 14 T104 Prop GA planOpen source ↗
- ERCF2509N 14 T105 Construction DetailsOpen source ↗