Opportunity overview
This Tender is for a supplier to undertake remediation and landscaping development work including hard and soft surface landscaping, the installation of associated street furniture and landscape features at Kerrier Way, Camborne. Key elements of the landscape works include the completion and/or remediation of unfinished works as follows: • Rectification and completion of paths and paved seating areas. • General remediation of the site following a long term pause in construction activities • Installation of remaining landscape furniture and features, including benches, seating walls and bespoke gateway art/features. • Soft landscaping including, preparation works and weeding, seeding, amenity planting, boundary planting and tree planting. The estimated overall maximum budget for the tender is £215,000 (exc. VAT) although this will be ultimately determined by the bid prices which are returned as part of this tender. The Contract period will be 8 weeks with an option to extend to 12 weeks Full details can be found in the accompanying tender pack.
Classification
- CPV45112700 — Landscaping work
- CPV45112710 — Landscaping work for green areas
- CPV45112711 — Landscaping work for parks
- CPV45112712 — Landscaping work for gardens
- CPV45112720 — Landscaping work for sports grounds and recreational areas
- CPV45112730 — Landscaping work for roads and motorways
Lots
- Lot 1£215k
Documents and notices
- Tender notice on Find a TenderOpen source ↗
- M580A_DR_L_3010_STEEL_CUTTING-M580_Rev1 Details drawingOpen source ↗
- ML580a-KRC-ML-DR-L-1001_Masterplan_Rev2 Details drawingOpen source ↗
- ML580a-KRC-ML-DR-L-1004_Hardworks and Levels_Rev2 Details drawingsOpen source ↗
- ML580a-KRC-ML-DR-L-1010_REMAINING WORKS HARD_Rev2 Details drawingOpen source ↗
- ML580a-KRC-ML-DR-L-1011_REMAINING WORKS SOFT_Rev2 Details drawingOpen source ↗
- ML580a-KRC-ML-DR-L-3001_HARD LANDSCAPE DETAILS_Rev2 Details drawingOpen source ↗
- ML580a-KRC-ML-DR-L-3005_FURNITURE_Rev1 Details drawingOpen source ↗
- ML580a-KRC-ML-DR-L-4001_SOFT LANDSCAPE DETAILS_Rev2 Details drawingOpen source ↗
- ML580a-KRC-ML-DR-L-4002_PLANTING_Rev2 Details drawingOpen source ↗
- Design information - Steel and other (contained in zipped folder)Open source ↗
- Reports from Previous Proposed Developments (contained in zipped folder)Open source ↗
- Topological and utilities survey (contained in zipped folder)Open source ↗
- GEO1740158135 - Summary report Geotechnical reportOpen source ↗
- GEO1740158135 MRA - Pass (with guidance) Mining risk assessmentOpen source ↗
- Phase 3 Remediation Strategy Kerrier Way 21817rev5Open source ↗
- SWWIM Map 1in500@A3 South West Water mapping of supplyOpen source ↗
- SWWIM Map 1in1250@A3 South West Water mapping of supplyOpen source ↗
- KerrierWay_Public_consultation_statement Original consultation document outlining community wishesOpen source ↗
- Below Threshold-ITT-Part B-Response _vIssued_01.04.2026 Invitation to Tender Part B document which must form part of the bidder response documents for submission.Open source ↗