Opportunity overview
The Works are split into 3 specific areas as follows: • Enabling works – Installing sheet piling through earth and engineered dams both upstream and downstream of the river Frome to provide a robust temporary dam • Permanent works- Install sheet piling both East and West of M5 tying into concrete segregating wall , existing scour piles and existing riverbank. Install capping beam to top of all sheet piles. • Remedial works – Remove sheet piles from the temporary dam and remove from site.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Suttle Project Limited
- Contract value
- £499.5k
- Awarded
- Not supplied
- Contract signed
- 28 Jul 2026
- Including VAT
- £599.4k
- Award ID
- 1
- Status
- active
- Identifier
- GB-PPON PZTR-3824-YZVG
- Location
- Hamworthy, UKK24, BH15 4JY, United Kingdom
Classification
No classification was supplied.
Lots
- Lot 1Value not stated
Documents and notices
- Contract details notice on Find a TenderOpen source ↗