Opportunity overview
Provision of site clearance and soft strip works at the CEDOS Building, Westbridge Depot, Northampton. The works include removal of internal fixtures, fittings and non-structural elements, clearance of debris and waste materials, disconnection and safe isolation of services where required, and preparation of the building for subsequent redevelopment or demolition works. The contractor is required to supply all labour, plant, equipment and waste disposal services necessary to complete the works in accordance with relevant health and safety legislation and environmental regulations. All waste must be removed from site and disposed of in accordance with statutory requirements.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
NDC CONSULTANCY LTD
- Contract value
- £52.8k
- Awarded
- Not supplied
- Contract signed
- 16 Feb 2026
- Including VAT
- £63.4k
- Award ID
- 1
- Status
- active
- Identifier
- GB-COH 11347845
- Location
- Towcester, UKF24, NN12 8AX, United Kingdom
Classification
No classification was supplied.
Lots
- Lot 1Value not stated
Documents and notices
- Contract details notice on Find a TenderOpen source ↗