Surfacing Works for Gloucestershire County Council 2022 to 2026 (2026 to 2027)

Gloucestershire County Council · award, contract

Tender information last checkedLast checked 4 Oct 2026, 18:17.

Opportunity overview

This VEAT Notice gives advance public warning that the Authority intends to modify its existing contract titled "Surfacing Works for Gloucestershire County Council 2022 to 2026" solely to extend the contract term beyond its current expiry date. The Authority intends to extend the existing contract for a period of 12 months, from the current expiry date of 31st March 2026, ending on 31st March 2027. The procurement process for a replacement structural maintenance contract, that was intended to replace the Council's current structural maintenance contract, was halted in Autumn 2025 due to a technical issue that arose with the tender documents. In considering the next steps, it is considered that it would be prudent to extend the current contract for a period of one year to enable the Council to consider its approach to re-procurement and ensure that the procurement better reflects the emerging, but as yet unclear service requirement arising as a result of the forthcoming Local Government Reorganisation in Gloucestershire which have the potential to impact this County wide service. The long-term position related to Local Government Reorganisation in Gloucestershire remains unclear. The structural make-up of local authorities in the county could have a material impact on how the proposed replacement structural maintenance contract might be structured and operated. Risks therefore exist in progressing with such a high value and high-profile contract whilst there remains considerable 'unknowns'. This could risk locking the Council into a long-term contract and a delivery model now, which might not best suit local need and / or would require re-negotiation once the Local Government Reorganisation position is more fully understood. The intention is that any replacement structural maintenance contract following this extension will commence on 1st April 2027. The Authority will begin the procurement process for this in April 2026 through the publication of a Market Engagement Notice. The extension qualifies as a non substantial modification under Regulation 72(1)(e) and Regulation 72(8) of the Public Contracts Regulations 2015.

Awarded to

Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.

Tarmac Trading Limited

Matched by number
Contract value
£24m
Awarded
Not supplied
Contract signed
25 Feb 2026
Award ID
017123-2026-1
Status
active
Identifier
GB-COH 00453791
Location
Birmingham, UK, United Kingdom

Classification

  • CPV45233000 — Construction, foundation and surface works for highways, roads

Lots

  • The modification is required to ensure continuity of services and to allow more time for a procurement process to be developed in respect of a longer-term replacement contract which better reflects the requirements of the emerging Local Government Reorganisation position. The modification is necessary because: • The Authority requires continuity of service while undertaking market review and preparing a compliant procurement procedure. • The need for the extension could not reasonably have been foreseen during the original procurement. • The extension does not exceed thresholds that would render it substantial. The works are part of the structural maintenance programme for Gloucestershire County Council and will be ordered by Task Order for each individual package/scheme. Works to consist of structural repairs to the County Network including planing off existing surfaces and replacement to the various depths and layers required by the design of each scheme. Works will also include minor works reactive schemes from Area Managers budgets Depot schemes tend to be smaller in size than schemes in the structural maintenance programme. Works will also include a limited number of patching schemes. Works will include temporary traffic management, site clearance, adjustment to ironworks, siding, surfacing, ancillary kerbing, road marks and patching. The works will be located across the County. The intention is that any replacement structural maintenance contract following this extension will commence on 1st April 2027. The Authority will begin the procurement process for this in April 2026 through the publication of a Market Engagement Notice.Value not stated

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
ocds-h6vhtk-065ca1
Status
complete
Main Procurement Category
works
Procurement Method
limited
Procurement Method Details
Award procedure without prior publication of a call for competition
Why this procedure was chosen
The Contracting Authority intends to extend the term of the existing contract under Regulation 72(1)(e) of the Public Contracts Regulations 2015 on the basis that the modification is non substantial. The extension does not alter the overall nature of the contract and satisfies the tests set out in Regulation 72(8). The modification does not render the contract materially different in character, does not introduce conditions that would have allowed for different bidders or results, does not shift the economic balance in favour of the supplier, and does not considerably extend the scope of the contract. Case law confirms that such changes, where they do not materially alter the character or scope of the contract, fall within the non substantial safe harbour under Regulation 72(1)(e). The extension is limited in scope and duration and is necessary to ensure continuity of service while the Authority prepares the next procurement stage. No new procurement procedure is required. This VEAT notice is being published voluntarily to ensure transparency. The extension does not materially alter the nature of the contract, does not change the economic balance in favour of the supplier, and does not considerably extend the scope of the original procurement. These considerations align with the non substantial modification tests applied in Regulation 72(8), consistent with existing caselaw interpretation. The modification proposed is justified under Regulation 72(1)(e) and 72 (8) PCRs on the basis that: a) Renders the contract materially different in character from the original. The proposal is a 25% in length and 30% in value change to the original contract. There is no change to the scope of the services. The contract remains for the delivery of highways resurfacing though the provision of materials, equipment and expertise for another year. b) Introduces conditions which had they been part of the original procurement would have allowed for the selection of an alternative supplier or would have attracted additional participants. In all cases this condition is considered in the context of the time the contract was procured and not when it was varied. It is considered unlikely that a five year vs. four-year contract would have altered the outcome - it is unlikely to have attracted different participants, and this proposes no material change to the supplied services. c) Changes the economic balance of the contract in favour of the contractor in a manner which was not provided for in the initial contract. There is no change to the payment structure or level of service to be provided. Pricing will be on the same basis as now with a potential inflation increase. The current pricing was based on competitive tender in 2022. d) Extends the scope of the contract considerably. Regulation 72 allows a 50% increase in value in limited circumstances. The proposal is a 25% in length, and 30% in value, change to the original contract and no other changes are being made to the scope of services. The scope of services continues to cover existing highways resurfacing works, through the provision of materials, equipment and expertise. e) Introduces a new contractor other than in accordance with Reg. 72(1)(d). This is not applicable as the contract remains with the incumbent supplier, Tarmac Trading Services.

Legal basis

Id
32014L0024
Scheme
CELEX

Classification

Scheme
CPV
Id
45233000
Description
Construction, foundation and surface works for highways, roads

Covered By

GPA

Procedure reasons

Entry 1
Scheme
TED_PT_AWARD_CONTRACT_WITHOUT_CALL
Id
D_OUTSIDE_SCOPE
Description
The procurement falls outside the scope of application of the directive

Lots and requirements

Entry 1
Id
1
Description
The modification is required to ensure continuity of services and to allow more time for a procurement process to be developed in respect of a longer-term replacement contract which better reflects the requirements of the emerging Local Government Reorganisation position. The modification is necessary because: • The Authority requires continuity of service while undertaking market review and preparing a compliant procurement procedure. • The need for the extension could not reasonably have been foreseen during the original procurement. • The extension does not exceed thresholds that would render it substantial. The works are part of the structural maintenance programme for Gloucestershire County Council and will be ordered by Task Order for each individual package/scheme. Works to consist of structural repairs to the County Network including planing off existing surfaces and replacement to the various depths and layers required by the design of each scheme. Works will also include minor works reactive schemes from Area Managers budgets Depot schemes tend to be smaller in size than schemes in the structural maintenance programme. Works will also include a limited number of patching schemes. Works will include temporary traffic management, site clearance, adjustment to ironworks, siding, surfacing, ancillary kerbing, road marks and patching. The works will be located across the County. The intention is that any replacement structural maintenance contract following this extension will commence on 1st April 2027. The Authority will begin the procurement process for this in April 2026 through the publication of a Market Engagement Notice.
Has Options
No

Items and delivery

Item 1
Id
1
Related Lot
1

Delivery locations

Entry 1
Region
UKK13

Buyer, suppliers and contacts

Organisation 1
Name
Gloucestershire County Council
Id
GB-FTS-143856

Identifier

Legal Name
Gloucestershire County Council
No Identifier Rationale
notOnAnyRegister

Address

Street Address
Shire Hall, Westgate Street
Locality
Gloucester
Region
UKK13
Postal Code
GL12TG
Country Name
United Kingdom

Contact

Name
Mike McGowan

Roles

buyer

Details

Classifications

Entry 1
Scheme
TED_CA_TYPE
Id
REGIONAL_AUTHORITY
Description
Regional or local authority
Entry 2
Scheme
COFOG
Id
01
Description
General public services
Organisation 2
Name
Tarmac Trading Limited
Id
GB-COH-00453791

Identifier

Legal Name
Tarmac Trading Limited
Id
00453791
Scheme
GB-COH

Address

Locality
Birmingham
Region
UK
Country Name
United Kingdom

Roles

supplier

Details

Scale
large
Organisation 3
Name
Gloucestershire County Council
Id
GB-FTS-3499

Identifier

Legal Name
Gloucestershire County Council

Address

Locality
Gloucester
Country Name
United Kingdom

Roles

reviewBody

Award information

Award 1
Id
017123-2026-1
Title
Surfacing Works for Gloucestershire County Council 2022 to 2026 (2026 to 2027 )
Status
active

Related lots

1

Suppliers

Supplier 1
Id
GB-COH-00453791
Name
Tarmac Trading Limited

Contracts and changes

Entry 1
Id
017123-2026-1
Award ID
017123-2026-1
Title
Surfacing Works for Gloucestershire County Council 2022 to 2026 (2026 to 2027 )
Status
active
Date Signed
25 Feb 2026, 00:00

Value

Amount
24,000,000
Currency
GBP

Recorded locations

  • Buyer location · Gloucester · UKK13 · GL12TG · United Kingdom
  • Delivery location · UKK13

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. 017123-2026award, contract ·