Opportunity overview
The contract value and term have both been increased.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Briggs & Forrester Special Projects Limited
Match pending…
- Contract value
- £4.5m
- Awarded
- Not supplied
- Contract signed
- 14 Nov 2023
- Award ID
- 006271-2026-1-1
- Status
- active
- Location
- Northampton, UKF24, NN2 6LZ, United Kingdom
Classification
- CPV45331200 — Ventilation and air-conditioning installation work
Lots
- Please note that this is a modification notice and not an open opportunity. The City of London Corporation (the City) invited Tenders for the provision of the design, construction, strip out and connection and completion of the replacement of the Guildhall chillers, to provide a centralised chiller system. The Contractor is required to work up the client design information (RIBA Stage 3) to construction detail to meet the start on site date. The Contractor is to remove the five existing North Wing chillers including the Cooling tower and install in their place six new larger chillers. The capacity of the six new chillers will be sufficient to serve the entire Guildhall Building allowing the West Wing chillers and associated cooling towers to be de-commissioned and removed. A new chilled water link will be installed at roof level between the North Wing and West/East Wings.Value not stated