Home / Opportunities / Opportunity
PROCUREMENT OPPORTUNITY

PEACEPLUS Works Contractor for Reconnected Belfast Project at Waterworks and Alexandra Park

Belfast City Council · tender

Tender information last checkedLast checked 5 Oct 2026, 05:52.

Opportunity overview

The Project focuses on re-generating Waterworks and Alexandra Park, the objective of the project is to increase cross-community integration through a transformed shared space in north Belfast, which will enable 33.18 hectares of parkland space to be upgraded and capable of facilitating participation of thousands of people from all communities. Improvements at Waterworks Park comprise the demolition of the existing Waterworks Bothy and replacement with a new building to include public toilets, Changing Places, multi-purpose community room and kitchenette, extension to existing Cavehill Road gatehouse building, entrance improvements, new events space including multipurpose decking, resurfacing of footways, new pedestrian lighting along key routes, a dog park, replacement platforms and viewing area, replacement surface to existing small sided 3G pitch, and upgrades to existing Queen Mary’s playground. Improvements at Alexandra Park include the resurfacing of footways, new pedestrian lighting along key routes, new reinforced grass event space, new lake viewing area, new public toilets and changing places, entrance improvements, 2no existing bridges replaced, new pedestrian entrance, new multi-sport synthetic surface with cover, and upgrades to existing play parks. Streetscape improvements along Camberwell Terrace and Castleton Gardens include resurfacing of footways with new kerbs; resurfaced carriageways and new tactile paving at pedestrian crossings; and all associated works. Additionally, works include refurbishment and safety works to the Waterworks upper and lower reservoirs, and Alexandra Park lake reservoir, to be complemented with wider environmental, landscape and connectivity improvements. The proposed reservoir works comprise of a new overflow structure with reinforcement and protection of the return embankment parallel to the bywash channel at Waterworks Upper reservoir, repairs to the upstream face of Waterworks Lower reservoir with the addition of wetland planting to reduce the overall capacity of the reservoir, and removal of an existing parapet wall and embankment reinforcement at the Alexandra Park Lake reservoir.

Classification

  • CPV45000000 — Construction work
  • CPV45112710 — Landscaping work for green areas
  • CPV45212100 — Construction work of leisure facilities
  • CPV45212290 — Repair and maintenance work in connection with sports facilities
  • CPV45233210 — Surface work for highways
  • CPV45233262 — Pedestrian zone construction work
  • CPV45233293 — Installation of street furniture
  • CPV45247270 — Reservoir construction works

Lots

  • The Project focuses on re-generating Waterworks and Alexandra Park, the objective of the project is to increase cross-community integration through a transformed shared space in north Belfast, which will enable 33.18 hectares of parkland space to be upgraded and capable of facilitating participation of thousands of people from all communities. Improvements at Waterworks Park comprise the demolition of the existing Waterworks Bothy and replacement with a new building to include public toilets, Changing Places, multi-purpose community room and kitchenette, extension to existing Cavehill Road gatehouse building, entrance improvements, new events space including multipurpose decking, resurfacing of footways, new pedestrian lighting along key routes, a dog park, replacement platforms and viewing area, replacement surface to existing small sided 3G pitch, and upgrades to existing Queen Mary’s playground. Improvements at Alexandra Park include the resurfacing of footways, new pedestrian lighting along key routes, new reinforced grass event space, new lake viewing area, new public toilets and changing places, entrance improvements, 2no existing bridges replaced, new pedestrian entrance, new multi-sport synthetic surface with cover, and upgrades to existing play parks. Streetscape improvements along Camberwell Terrace and Castleton Gardens include resurfacing of footways with new kerbs; resurfaced carriageways and new tactile paving at pedestrian crossings; and all associated works. Additionally, works include refurbishment and safety works to the Waterworks upper and lower reservoirs, and Alexandra Park lake reservoir, to be complemented with wider environmental, landscape and connectivity improvements. The proposed reservoir works comprise of a new overflow structure with reinforcement and protection of the return embankment parallel to the bywash channel at Waterworks Upper reservoir, repairs to the upstream face of Waterworks Lower reservoir with the addition of wetland planting to reduce the overall capacity of the reservoir, and removal of an existing parapet wall and embankment reinforcement at the Alexandra Park Lake reservoir.Value not stated

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
PQQ 4707
Status
active
Main Procurement Category
works
Procurement Method
selective
Procurement Method Details
Restricted procedure
Has Recurrence
No

Legal basis

Id
32014L0024
Scheme
CELEX

Classification

Scheme
CPV
Id
45000000
Description
Construction work

Submission Method

electronicSubmission
written

Covered By

GPA

Tender Period

Ends
16 Feb 2026, 12:00

Submission terms

Languages

en

Lots and requirements

Entry 1
Id
1
Description
The Project focuses on re-generating Waterworks and Alexandra Park, the objective of the project is to increase cross-community integration through a transformed shared space in north Belfast, which will enable 33.18 hectares of parkland space to be upgraded and capable of facilitating participation of thousands of people from all communities. Improvements at Waterworks Park comprise the demolition of the existing Waterworks Bothy and replacement with a new building to include public toilets, Changing Places, multi-purpose community room and kitchenette, extension to existing Cavehill Road gatehouse building, entrance improvements, new events space including multipurpose decking, resurfacing of footways, new pedestrian lighting along key routes, a dog park, replacement platforms and viewing area, replacement surface to existing small sided 3G pitch, and upgrades to existing Queen Mary’s playground. Improvements at Alexandra Park include the resurfacing of footways, new pedestrian lighting along key routes, new reinforced grass event space, new lake viewing area, new public toilets and changing places, entrance improvements, 2no existing bridges replaced, new pedestrian entrance, new multi-sport synthetic surface with cover, and upgrades to existing play parks. Streetscape improvements along Camberwell Terrace and Castleton Gardens include resurfacing of footways with new kerbs; resurfaced carriageways and new tactile paving at pedestrian crossings; and all associated works. Additionally, works include refurbishment and safety works to the Waterworks upper and lower reservoirs, and Alexandra Park lake reservoir, to be complemented with wider environmental, landscape and connectivity improvements. The proposed reservoir works comprise of a new overflow structure with reinforcement and protection of the return embankment parallel to the bywash channel at Waterworks Upper reservoir, repairs to the upstream face of Waterworks Lower reservoir with the addition of wetland planting to reduce the overall capacity of the reservoir, and removal of an existing parapet wall and embankment reinforcement at the Alexandra Park Lake reservoir.
Has Renewal
No
Has Options
No
Status
active

Contract period

Duration In Days
390

Submission terms

Variant Policy
notAllowed

Items and delivery

Item 1
Id
1
Related Lot
1

Additional Classifications

Entry 1
Scheme
CPV
Id
45112710
Description
Landscaping work for green areas
Entry 2
Scheme
CPV
Id
45212100
Description
Construction work of leisure facilities
Entry 3
Scheme
CPV
Id
45212290
Description
Repair and maintenance work in connection with sports facilities
Entry 4
Scheme
CPV
Id
45233210
Description
Surface work for highways
Entry 5
Scheme
CPV
Id
45233262
Description
Pedestrian zone construction work
Entry 6
Scheme
CPV
Id
45233293
Description
Installation of street furniture
Entry 7
Scheme
CPV
Id
45247270
Description
Reservoir construction works

Delivery locations

Entry 1
Region
UKN06

Planning and budget

Budget

Finance

Entry 1
Id
1
Description
ERDF – European Regional Development Fund – 2021-2027

Financing Party

Name
European Union
Id
GB-FTS-172

Related lots

1

Buyer, suppliers and contacts

Organisation 1
Name
Belfast City Council
Id
GB-FTS-21397

Identifier

Legal Name
Belfast City Council

Address

Street Address
9-21 Adelaide Street
Locality
Belfast
Region
UKN06
Postal Code
BT2 8DJ
Country Name
United Kingdom

Contact

Roles

buyer

Details

Classifications

Entry 1
Scheme
TED_CA_TYPE
Id
REGIONAL_AUTHORITY
Description
Regional or local authority
Entry 2
Scheme
COFOG
Id
08
Description
Recreation, culture and religion
Organisation 2
Name
European Union
Id
GB-FTS-172

Roles

funder
Organisation 3
Name
ICE
Id
GB-FTS-135539

Identifier

Legal Name
ICE

Address

Street Address
One Great George Street
Locality
London
Postal Code
SW1P 3AA
Country Name
United Kingdom

Roles

reviewBody

Recorded locations

  • Buyer location · Belfast · UKN06 · BT2 8DJ · United Kingdom
  • Delivery location · UKN06

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. 003934-2026tender ·