Opportunity overview
The Safety Assurance supplier will be responsible to support obtaining necessary approvals to support delivery of works. The safety assurance supplier will adhere to principles and standards in place according to the following: Application of the Common Safety method for Risk Evaluation and Assessment (NR Standard NR/L2/RSE/100/02). Commission Regulation (EU) 402/2013. The Future works scope is a modification to the in-service ETCS system operating between Heathrow (Stage A) and Ealing Broadway (Stage TB2), with the safety assurance expected to build upon the existing works and documentation produced for these stages.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
SYNERGY RAIL
- Published award value
- £420.6k
- Awarded
- Not supplied
- Award ID
- 1
- Status
- pending
- Identifier
- GB-COH 07052630
- Location
- Beckenham, UKI61, BR3 1DZ, United Kingdom
Classification
No classification was supplied.
Lots
- Lot 1Value not stated
Documents and notices
- Transparency notice on Find a TenderOpen source ↗