Opportunity overview
The Borough Council of Kings Lynn and West Norfolk are required to undertake an Integrated SFRA and Water Cycle Study as an essential part of the pre-production/evidence gathering stages of the Local Plan and in preparation of the Sustainability Appraisal (SA). The Council is in the process of producing a New Local Plan (NLP) and this will require an update to the existing evidence base for the recently adopted Local Plan (March 2025). For this plan, the Council produced a joint Level 1 Strategic Flood Risk Assessment (SFRA) with other Norfolk Authorities. A separate Level 2 assessment was also produced to inform the allocation of sites. A current Water Cycle Study exists, but this is now considered out of date and should form part of the wider SFRA review. A Surface Water Management Plan was produced in 2012, but this is now considered out of date and will be replaced by this SFRA review.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Wallingford Hydrosolutions Limited
- Published award value
- Value not stated
- Awarded
- Not supplied
- Contract signed
- 27 May 2026
- Award ID
- 1
- Status
- active
- Identifier
- GB-COH 05025973
- Location
- Wallingford, UKJ14, OX10 8BA, United Kingdom
Classification
No classification was supplied.
Lots
- Lot 1Value not stated
Documents and notices
- Contract details notice on Find a TenderOpen source ↗