REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)

The Tall Ship Glenlee Trust · award, contract

Tender information last checkedLast checked 4 Oct 2026, 22:56.

Opportunity overview

The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund. Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power – single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.

Awarded to

Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.

Saltire Lifts LTD

Match pending…
Contract value
£51.8k
Awarded
Not supplied
Contract signed
10 Feb 2026
Award ID
011908-2026-1
Status
active
Location
Coatbridge, UK, ML5 4EF, United Kingdom

Classification

  • CPV42416000 — Lifts, skip hoists, hoists, escalators and moving walkways
  • CPV42416100 — Lifts
  • CPV42416120 — Goods lifts
  • CPV42416130 — Mechanical lifts
  • CPV42417000 — Elevators and conveyors
  • CPV42419510 — Parts of lifts

Lots

  • Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power – single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.Value not stated

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
ocds-h6vhtk-05f7ca
Status
complete
Main Procurement Category
goods
Procurement Method
open
Procurement Method Details
Open procedure

Legal basis

Id
32014L0024
Scheme
CELEX

Classification

Scheme
CPV
Id
42416100
Description
Lifts

Procedure

Is Accelerated
Yes
Accelerated Rationale
We are ok with 15 days

Covered By

GPA

Lots and requirements

Entry 1
Id
1
Description
Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power – single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.
Has Options
No
Status
cancelled

Award criteria

Criteria

Criterion 1
Name
Quality
Type
quality
Description
20
Criterion 2
Name
Performance Criteria - Timely completion of project to meet funding requirements
Type
quality
Description
20
Criterion 3
Type
price
Description
20

Items and delivery

Item 1
Id
1
Related Lot
1

Additional Classifications

Entry 1
Scheme
CPV
Id
42416000
Description
Lifts, skip hoists, hoists, escalators and moving walkways
Entry 2
Scheme
CPV
Id
42416100
Description
Lifts
Entry 3
Scheme
CPV
Id
42416120
Description
Goods lifts
Entry 4
Scheme
CPV
Id
42416130
Description
Mechanical lifts
Entry 5
Scheme
CPV
Id
42419510
Description
Parts of lifts
Entry 6
Scheme
CPV
Id
42417000
Description
Elevators and conveyors

Delivery locations

Entry 1
Region
UKM82

Delivery Location

Description
The Tall Ship Glenlee, 150 Pointhouse Place, Glasgow, G3 8RS

Buyer, suppliers and contacts

Organisation 1
Name
The Tall Ship Glenlee Trust
Id
GB-FTS-169469

Identifier

Legal Name
The Tall Ship Glenlee Trust

Address

Street Address
150 Pointhouse Place
Locality
Glasgow
Region
UK
Postal Code
G3 8RS
Country Name
United Kingdom

Contact

Name
Fiona Greer
Telephone
+44 1413573699

Roles

buyer
centralPurchasingBody

Details

Classifications

Entry 1
Scheme
TED_CA_TYPE
Description
Registered charity
Entry 2
Scheme
COFOG
Id
08
Description
Recreation, culture and religion
Organisation 2
Name
Saltire Lifts LTD
Id
GB-FTS-104230

Identifier

Legal Name
Saltire Lifts LTD

Address

Street Address
The Atrium Business Centre, North Caldeen Road
Locality
Coatbridge
Region
UK
Postal Code
ML5 4EF
Country Name
United Kingdom

Contact

Telephone
+44 7752153885

Roles

supplier

Details

Scale
sme
Organisation 3
Name
Glasgow Sheriff Court and Justice of the Peace Court
Id
GB-FTS-2494

Identifier

Legal Name
Glasgow Sheriff Court and Justice of the Peace Court

Address

Locality
Glasgow
Country Name
United Kingdom

Roles

reviewBody

Award information

Award 1
Id
011908-2026-1
Status
active

Related lots

1

Suppliers

Supplier 1
Id
GB-FTS-104230
Name
Saltire Lifts LTD

Contracts and changes

Entry 1
Id
011908-2026-1
Award ID
011908-2026-1
Status
active
Date Signed
10 Feb 2026, 00:00

Value

Amount
51,829
Currency
GBP

Recorded locations

  • Buyer location · Glasgow · UK · G3 8RS · United Kingdom
  • Delivery location · UKM82

Notice and amendment history

2 published notice versions reviewed by ProcuraAxis.

2 VERSIONS
  1. 003536-2026tenderUpdate ·
  2. 011908-2026award, contract ·