Opportunity overview
Remedial works to Kingsway Moreton Avenue, Swanspool Brook Cycle / Foot Path, Wellingborough. Set up compound and welfare facility for security of plant ( out of hours ), material storage area and welfare for staff. Install safety barriers and signs. Saw cut existing surface back to good tarmac. Excavate and dispose of existing surface. Weed kill area of excavation. Install a tack coat emulsion and cold joint to sides. Dispose of all arisings and area left clean Areas Total of 794.88 sq metres.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
FINESSE GROUNDWORKS LTD
- Contract value
- £4.3m
- Awarded
- Not supplied
- Contract signed
- 17 Aug 2026
- Including VAT
- £5.2m
- Award ID
- 1
- Status
- active
- Identifier
- GB-COH 10481861
- Location
- Kettering, UKF25, NN15 7HH, United Kingdom
Classification
No classification was supplied.
Lots
- Lot 1Value not stated
Documents and notices
- Contract details notice on Find a TenderOpen source ↗