Opportunity overview
UKRI-STFC requires a construction minor works framework that is capable of supporting the Estates Transformation Strategy. The include scope shall be; General Building works may include but not be limited to ceilings, doors, walls, structural steelworks, roofs, masonry, scaffolding, carpentry and joinery, plastering, and can include small mechanical and electrical works of part of a main building project. Mechanical works may include boiler, gas fired water heater or calorifier replacements, pipework modifications or replacement, associated elements including controls, pipework thermal insulation, external services installation, ventilation and cooling works. Electrical works may include switch gear/distribution board replacement, alterations to or replacement of wiring infrastructure, modifications, and additions to general and specialist electrical installations, lighting replacement, lighting controls, external cable infrastructure replacement. Works Categories (Lots) General Works – offices, labs, kitchens, refurbishments Construction Works – extensions, adaptations, building projects Mechanical Installations & Maintenance – HVAC, gas, renewables Electrical Installations & Testing – LV systems, lighting, data, fire Roofing – flat & pitched roofing, maintenance, rainwater goods Civils & Groundworks paving, drainage, fencing, access systems Cladding, Glazing & Insulation – doors, fire systems, insulation Infrastructure – HV/LV, water, gas, UPS, switchgear
Classification
- CPV45000000 — Construction work
Lots
- Lot 1Value not stated
Documents and notices
- Preliminary market engagement notice on Find a TenderOpen source ↗