Opportunity overview
The works comprise the upgrade of the Trust’s water storage on site. The Work is located in the existing Towers of Block P (East and West Towers). The scheme involves the provision of new storage tanks and associated new pipework/systems connecting onto the existing infrastructure systems being retained. The works will involve a contractor design solution to provide the new mezzanine floors to support the new storage tanks including altering and adapting the means of access to the new/existing facility. Whilst the majority of the new installation works can be undertaken simultaneously, the final connections/bringing the new tanks/system live must be done sequentially. The contractor will be required to commission (including chlorination) the first tank to allow partial possession of the works prior to commencing the final connection works for the second tank. It is envisaged that the existing tanks will still be in use to allow draw off of water from the existing tanks until empty and the new tanks are fully commissioned. The contractor is required as part of their submission to provide a cost for emptying the tanks and removing the same.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Midland Engineering (UK) LTD
- Contract value
- £428.6k
- Awarded
- Not supplied
- Contract signed
- 4 Dec 2025
- Including VAT
- £514.3k
- Award ID
- 1
- Status
- active
- Location
- Birmingham, UKG32, B360AJ, United Kingdom
Classification
- CPV45330000 — Plumbing and sanitary works
- CPV45350000 — Mechanical installations
Lots
- Lot 1£400k
Documents and notices
- Contract details notice on Find a TenderOpen source ↗
- Tender notice on Find a TenderOpen source ↗