Opportunity overview
TfGM has established a contract to ascertain current asset condition information & outline design (Phase 1). At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was “floated” in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be assessed against relevant standards and the Metrolink Infrastructure Technical Specification System Earthing Policy to ensure compliance and any identified non-compliances rectified on site.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Siemens Mobility Limited
- Contract value
- £527.5k
- Awarded
- Not supplied
- Contract signed
- 12 Aug 2025
- Award ID
- 051274-2025-1
- Status
- active
- Location
- London, UK, NW1 2PL, United Kingdom
Classification
- CPV45000000 — Construction work
Lots
- TfGM has established a contract to ascertain current asset condition information & outline design (Phase 1). At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was “floated” in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be assessed against relevant standards and the Metrolink Infrastructure Technical Specification System Earthing Policy to ensure compliance and any identified non-compliances rectified on site.Value not stated