Opportunity overview
In 2024, Swansea Council undertook a prioritisation exercise and commissioned a Condition Survey and Risk Assessment for five Scheduled Monuments. The assessment identified four sites requiring urgent intervention to address Health & Safety risks and improve public understanding of those risks through interpretation panels. Sites Identified for Works 1. GM 371 – Morris Castle 2. GM 475 – Clyne Wood Arsenic and Copper Works (excluding the Ivy Tower) 3. GM 481 – White Rock 4. GM 482 – Foxhole River Staithes Scope of Works Vegetation Clearance and Protective planting to progress capital works Ecology Watch Briefs to ensure environmental compliance Installation of Interpretation Panels to enhance public engagement and safety Capital Works to stabilise and preserve monument structures, and address H&S at the sites All proposed works fall within the boundaries of Scheduled Monuments and will require Scheduled Monument Consent (SMC) from Cadw. The preparation and submission of SMC and planning applications will be integrated into the contract scope.
Classification
- CPV44000000 — Construction structures and materials; auxiliary products to construction (except electric apparatus)
- CPV45100000 — Site preparation work
- CPV45212314 — Historical monument or memorial construction work
- CPV45212351 — Prehistoric monument construction work
- CPV45212352 — Industrial monument construction work
- CPV71000000 — Architectural, construction, engineering and inspection services
- CPV73000000 — Research and development services and related consultancy services
- CPV77000000 — Agricultural, forestry, horticultural, aquacultural and apicultural services
- CPV90000000 — Sewage, refuse, cleaning and environmental services
Lots
- Lot 1£98.4k
Documents and notices
- Tender notice on Find a TenderOpen source ↗
- ITT_118325Open source ↗
- itt_118325Open source ↗