Opportunity overview
Network Rail (Wales and Western) intends to award a contract via direct award under the Procurement Act 2023 to Turbo Power Systems Limited (TPS) for the continued development (Phase 2) of a first-of-its-kind 25 kV Integrated Converter Prototype for use on the railway. This prototype forms part of a strategic innovation programme to enable the use of self-generated renewable energy for powering electric trains — a key enabler of Network Rail’s long-term decarbonisation and sustainability objectives. TPS, a specialist in advanced power electronic systems, initially proposed the concept to Network Rail and successfully delivered Phase 1, which included the design and demonstration of a proof of concept. This was formally reviewed and approved by Network Rail’s Technical Authority, confirming both technical feasibility and alignment with operational requirements. The Phase 2 contract will progress the innovation to a functional prototype, building directly on the technical foundations established in the initial phase.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Turbo Power Systems Ltd
- Published award value
- £2.2m
- Awarded
- 4 Sept 2025
- Award ID
- 1
- Status
- active
- Identifier
- GB-PPON PRZP-5234-CTQL
- Location
- Gateshead, UKC22, NE11 0QD, United Kingdom
Classification
No classification was supplied.
Lots
- Lot 1Value not stated
Documents and notices
- Contract details notice on Find a TenderOpen source ↗
- Contract award notice on Find a TenderOpen source ↗
- Transparency notice on Find a TenderOpen source ↗