Home / Opportunities / Opportunity
PROCUREMENT OPPORTUNITY

Appointment of Integrated Consultancy Team for Gortgonis Centre

Mid Ulster District Council · compiled

Tender information last checkedLast checked 30 Sept 2026, 07:25.

Opportunity overview

The initial contract involved the following: A multi use site consisting of - a 3G pitch, 6 lane running/walking track in astroturf or similar finish, building to accommodate a large main hall, gym with changing, changing for pitch, 3 meeting rooms, one with an outside play area and two with breakout rooms and toilets, amenity of public toilets and small kitchen, 2 outside play areas - one for older children and one for younger children, nature trails across the site, and For the reasons outlined in further detail within Section VII.2.2, the amended design consists of a 3g pitch, 6 lane running /walking track in shale, building to accommodate changing facilities for the pitch and a medium sized meeting room (general use no individual toilets or breakout rooms), amenity of public toilets and small kitchen, 1 outside play area. There have also been a number of Compensation Events under the Contract which have resulted in increased spend of £58,997.41, as well as a CPI uplift for 10% of Stage 4 and Riba stages 5 ,6 & 7, which resulted in an additional cost £22,831.92. The re-modelling and re-design of Riba Stage 4 at 55%, (as detailed above), resulted in an additional cost £42,581.92.

Awarded to

Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.

Gregory Architects Ltd

Matched by number
Contract value
£391.1k
Awarded
Not supplied
Contract signed
3 Jan 2018
Award ID
047178-2025-327343-2017-1
Status
active
Identifier
GB-COH NI621034
Location
Belfast, UKN, BT7 1NS, United Kingdom

Classification

  • CPV71220000 — Architectural design services
  • CPV71244000 — Calculation of costs, monitoring of costs
  • CPV71246000 — Determining and listing of quantities in construction
  • CPV71324000 — Quantity surveying services

Lots

  • The contract is for the provision of a project managed led multi-disciplinary team to prepare economic appraisal, concept plans and project manage the delivery of Gortgonis Centre (Coalisland)Value not stated

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
327343-2017
Main Procurement Category
services

Legal basis

Id
32014L0024
Scheme
CELEX

Classification

Id
71220000
Scheme
CPV
Description
Architectural design services

Lots and requirements

Entry 1
Id
1
Description
The contract is for the provision of a project managed led multi-disciplinary team to prepare economic appraisal, concept plans and project manage the delivery of Gortgonis Centre (Coalisland)

Contract period

Duration In Days
720

Items and delivery

Item 1
Id
1
Related Lot
1

Delivery locations

Entry 1
Region
UKN

Additional Classifications

Entry 1
Id
71244000
Scheme
CPV
Description
Calculation of costs, monitoring of costs
Entry 2
Id
71246000
Scheme
CPV
Description
Determining and listing of quantities in construction
Entry 3
Id
71324000
Scheme
CPV
Description
Quantity surveying services

Buyer, suppliers and contacts

Organisation 1
Id
GB-FTS-99956
Name
Mid Ulster District Council

Roles

buyer

Address

Region
UKN0B
Locality
Dungannon
Postal Code
BT71 6DT
Country Name
United Kingdom
Street Address
Dungannon Office, 15 Circular Road

Details

Identifier

Legal Name
Mid Ulster District Council
No Identifier Rationale
notOnAnyRegister

Contact

Name
Linda Ferguson
Telephone
+44 3000132132
Organisation 2
Id
GB-COH-NI621034
Name
Gregory Architects Ltd

Roles

supplier

Address

Region
UKN
Locality
Belfast
Postal Code
BT7 1NS
Country Name
United Kingdom

Details

Scale
large

Identifier

Id
NI621034
Scheme
GB-COH
Legal Name
Gregory Architects Ltd
Organisation 3
Id
GB-FTS-157408
Name
Mid Ulster District Council

Roles

reviewBody
mediationBody

Address

Locality
Dungannon
Postal Code
BT71 6DT
Country Name
United Kingdom
Street Address
15 Circular Road

Details

Identifier

Legal Name
Mid Ulster District Council

Contact

Telephone
+44 03000132132

Award information

Award 1
Id
047178-2025-327343-2017-1
Title
Appointment of Integrated Consultancy Team for Gortgonis Centre
Status
active

Suppliers

Supplier 1
Id
GB-COH-NI621034
Name
Gregory Architects Ltd

Related lots

1

Contracts and changes

Entry 1
Id
047178-2025-327343-2017-1
Title
Appointment of Integrated Consultancy Team for Gortgonis Centre
Status
active
Award ID
047178-2025-327343-2017-1
Date Signed
3 Jan 2018, 00:00

Items

Item 1
Id
1
Related Lot
1

Classification

Id
71220000
Scheme
CPV
Description
Architectural design services

Delivery locations

Entry 1
Region
UKN

Additional Classifications

Entry 1
Id
71244000
Scheme
CPV
Description
Calculation of costs, monitoring of costs
Entry 2
Id
71246000
Scheme
CPV
Description
Determining and listing of quantities in construction
Entry 3
Id
71324000
Scheme
CPV
Description
Quantity surveying services

Value

Amount
391,111.25
Currency
GBP

Period

Duration In Days
3,810

Amendments

Entry 1
Id
1
Rationale
Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: Planning - As part of the planning application, the scheme had to go through the Major Planning Process which resulted in additional engagement, through the planning process (Pre Application Notification (PAN)), which is a requirement of the planning process prior to a full planning application submission for projects over £10,000 sq metres. The PAN involves public consultation meetings and a subsequent report to accompany the formal planning application as a requirement of the planning process. In the planning process, requirements and stipulations by DFI regarding new access arrangements in relation to the site and the need for additional access arrangements and turning lane onto the site. This led to unforeseen time delays due to response delays from other government departments (good practice stipulates timelines for response but these were not met due to a range of other government department pressures). Due to the unforeseen elements required by these departments, a further design review and update of the design elements was also required causing further delays. Covid 19 and Brexit Inflation - The scheme had received full planning and all permissions and was ready to proceed when Covid 19 happened. This delayed the scheme for a couple of years, due to limited construction activity being undertaken and regular changes to government advice on movement during this time. The pandemic also changed the way that people were using leisure (with a greater focus on outside activity due to limitations on inside activity). A further unforeseen issue arose as a result of the unprecedented inflation and cost within the construction sector that occurred due to Covid and Brexit and the new restrictions on ways of working, movement and accessibility of goods. A full review of the design concept to reduce the scheme was required in order to allow the project to continue to proceed within the pre-existing budget constraint. A major element of the Gortgonis development is the new school that is being built to the north of the site. Whilst the school is not part of the Council leisure scheme, it has a major impact and both have to co-align in development. There were unforeseen delays for the Education Authority in the development of the school with regard to both restrictions concerning the Budget and Legal implications . These delays arose due to the capital finance constraints for the Education Authority (given Covid and Brexit and level of inflation, both of which impacted on the level of activity the EA could prioritise within their capital purse) and due to national pressures from COVID at the time, the scheme was removed from the short-term priority list for completion. The Council could not move forward on Phase II of the scheme without Phase I of the school development on the site. Following a release on budgetary pressures by the Department, the scheme was then moved back onto the short-term capital list to allow the scheme to proceed. The site transfer was originally intended to transfer to the school through the Education Authority, however, due to the Education Authority's policy on schools holding site ownership and issues with the school's governance the site had to be transferred directly to the school. Due to the parties involved in the matter there were three legal teams working for each body (Education Authority, Mid Ulster District Council and the Department of Education) reviewing the documentation and overseeing the transfer. Consequently, due to the complex nature of the transfer and the need for review by all three bodies legal representatives there were further delays in the interest of ensuring compliance with the law. The unforeseen reasons outlined within this section have resulted in the Council requiring the modifications outlined in Section VII.2.1 above.
Description
The initial contract involved the following: A multi use site consisting of - a 3G pitch, 6 lane running/walking track in astroturf or similar finish, building to accommodate a large main hall, gym with changing, changing for pitch, 3 meeting rooms, one with an outside play area and two with breakout rooms and toilets, amenity of public toilets and small kitchen, 2 outside play areas - one for older children and one for younger children, nature trails across the site, and For the reasons outlined in further detail within Section VII.2.2, the amended design consists of a 3g pitch, 6 lane running /walking track in shale, building to accommodate changing facilities for the pitch and a medium sized meeting room (general use no individual toilets or breakout rooms), amenity of public toilets and small kitchen, 1 outside play area. There have also been a number of Compensation Events under the Contract which have resulted in increased spend of £58,997.41, as well as a CPI uplift for 10% of Stage 4 and Riba stages 5 ,6 & 7, which resulted in an additional cost £22,831.92. The re-modelling and re-design of Riba Stage 4 at 55%, (as detailed above), resulted in an additional cost £42,581.92.

Recorded locations

  • Buyer location · Dungannon · UKN0B · BT71 6DT · United Kingdom
  • Delivery location · UKN

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. ocds-h6vhtk-0583f8-2025-08-08T10:44:41+01:00compiled ·