Home / Opportunities / Opportunity
PROCUREMENT OPPORTUNITY

Port of Dover Ferry Charging

Dover Harbour Board · Planned procurement notice on Find a Tender

Tender information last checkedLast checked 30 Sept 2026, 06:46.

Opportunity overview

The Port of Dover are seeking expressions of interest from strategic funding partners to work with us on an exciting new project to develop and enable the Port to facilitate green straights between Dover, Calais and Dunkirk, which will allow the port to offer ferry shore power charging. The port system generates approximately 1.1 million tonnes of CO2 annually (which is equivalent to 8% of UK maritime emissions as a whole), shipping being the largest contributor representing 75% of those emissions, the electrification of these ferries will drastically reduce these carbon and air quality emissions. The electrification of the ferries would mean that this vital trade route would also become a high-volume Green Corridor which would directly support DfT’s Maritime Decarbonisation Strategy, COP26 and the Clydebank Declaration objectives progressing the nation’s move to Net Zero 2050. This work would demonstrate a large-scale, real-world application for net zero shipping corridors, opening the door for similar investments and innovations across both the UK and the world, cementing the UK’s position as a leader in maritime decarbonisation. Whilst the works will be for the Port of Dover there is a requirement for strategic alignment with both the Port Boulogne Calais and the Port of Dunkerque. There are currently three ferry companies operating from the Port of Dover of which DFDS have made a public commitment to electrify their channel fleet by 2035, starting with 2 fully electric ferries joining the route as early as 2030. Due to the complexity, scale and capital requirements of these power demands the Port of Dover sees significant benefits in developing a strategic partnership approach. This approach would be a partnership with the Ferry operators and an appropriate 3rd party provider to deliver this step change in power for shore side ferry charging under a long-term power purchase agreement with appropriate commercial terms between parties. The intent is that the strategic funding partner will develop the following; - A new internal High Voltage (HV) network within the Port, dedicated to ferry charging, to facilitate an estimated 160MW inline with the requirements of the Ferry Operators (with on-site BESS and/or harmonisation of the ferry schedule this could reduce). - The necessary transformers, switch gear, on site BESS and cable infrastructure to allow the port to manage the power demand profile and locate power on multiple berths at the port. - Partner with a suitable supplier of the "plug" solution to allow the vessels to re-charge or connect to shore power when in berth, including power conversion equipment. Expressions of interest must be via our In-Tend Procurement Platform - available for enrolment here: https://in-tendhost.co.uk/portofdover/aspx/Home

Classification

  • CPV31321300 — High-voltage cable
  • CPV45232220 — Substation construction work
  • CPV45310000 — Electrical installation work
  • CPV45315100 — Electrical engineering installation works
  • CPV45315300 — Electricity supply installations
  • CPV45315400 — High voltage installation work
  • CPV45317300 — Electrical installation work of electrical distribution apparatus

Lots

  • Lot 1Value not stated · Including VAT · Source currency differs from tender

Documents and notices

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
ocds-h6vhtk-0569db
Status
planned
Above Threshold
Yes
Procurement Method
selective
Main Procurement Category
works
Procurement Method Details
Competitive flexible procedure
Expression Of Interest Deadline
30 Sept 2025, 23:59

Legal basis

Id
2023/54
Scheme
UKPGA

Expected award period

Ends
1 Apr 2026, 23:59

Communication

Future Notice Date
18 Sept 2025, 23:59

Submission terms

Electronic Submission Policy
notAllowed

Languages

en

Lots and requirements

Entry 1
Id
1
Status
planned

Value

Currency
AED
Including VAT
0

Contract period

Ends
1 Jan 2035, 23:59
Starts
8 Jun 2026, 00:00

Items and delivery

Item 1
Id
1
Related Lot
1

Additional Classifications

Entry 1
Id
45315400
Scheme
CPV
Description
High voltage installation work
Entry 2
Id
31321300
Scheme
CPV
Description
High-voltage cable
Entry 3
Id
45310000
Scheme
CPV
Description
Electrical installation work
Entry 4
Id
45315300
Scheme
CPV
Description
Electricity supply installations
Entry 5
Id
45315100
Scheme
CPV
Description
Electrical engineering installation works
Entry 6
Id
45317300
Scheme
CPV
Description
Electrical installation work of electrical distribution apparatus
Entry 7
Id
45232220
Scheme
CPV
Description
Substation construction work

Planning and budget

Documents

Entry 1
Id
044617-2025
Format
text/html
Notice Type
UK3
Description
Planned procurement notice on Find a Tender
Document Type
plannedProcurementNotice
Published
31 Jul 2025, 10:35
Entry 2
Id
044622-2025
Format
text/html
Notice Type
UK3
Description
Planned procurement notice on Find a Tender
Document Type
plannedProcurementNotice
Published
31 Jul 2025, 10:42

Buyer, suppliers and contacts

Organisation 1
Id
GB-PPON-PBWQ-3165-XGNL
Name
Dover Harbour Board

Roles

buyer

Address

Region
UKJ44
Country
GB
Locality
Dover
Postal Code
CT17 9BU
Country Name
United Kingdom
Street Address
Harbour House, Marine Parade

Details

Classifications

Entry 1
Id
privateUtility
Scheme
UK_CA_TYPE
Description
Private utility

Identifier

Id
PBWQ-3165-XGNL
Scheme
GB-PPON

Contact

Recorded locations

  • Buyer location · Dover · UKJ44 · CT17 9BU · United Kingdom

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. ocds-h6vhtk-0569db-2025-07-31T10:42:31+01:00Planned procurement notice on Find a Tender ·