Home / Opportunities / Opportunity
PROCUREMENT OPPORTUNITY

EPCs and EICRs - Surveys, Inspections & Testing

INCLUSION GROUP LIMITED · compiled

Tender information last checkedLast checked 30 Sept 2026, 05:44.

Opportunity overview

Inclusion Group, as the contracting authority, has awarded a 3 year contract to ECO Approach Limited for EPCs and EICRs - Surveys, Inspections & Testing. This award was made via a direct award, under Procurement for Housing's Funded Retrofit Works & Delivery framework.

Awarded to

Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.

Eco Approach Limited

Matched by number
Contract value
£430k
Awarded
Not supplied
Contract signed
26 Jun 2025
Award ID
039122-2025-1
Status
active
Identifier
GB-COH 08624580
Location
Beckenham, UK, BR3 1EW, United Kingdom

Classification

  • CPV98300000 — Miscellaneous services

Lots

  • The scope of this procurement covers the following essential services: EICR Inspections and Certification: Comprehensive Electrical Installation Condition Report inspections and subsequent certification. EPC Inspections and Certification: Energy Performance Certificate inspections and subsequent certification. All EICR and EPC inspections and certifications will be completed in line with agreed contract costs as per the asset list. The appointed supplier (ECO Approach Limited) will be responsible for ensuring the programme of inspections strives to achieve 100% compliance for both EICRs and EPCs across Inclusion Group's portfolio. Additionally, the contract outlines provisions for: Remedial Works: Works resulting from Planned Preventative Maintenance (PPM) activities that exceed a self-certification threshold (£150+) will require separate order numbers. Reactive Repairs and Improvements: Any reactive repairs and improvements will each be issued as separate ordersValue not stated

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
ocds-h6vhtk-055d4d
Status
complete
Procurement Method
limited
Main Procurement Category
services
Procurement Method Details
Award procedure without prior publication of a call for competition
Why this procedure was chosen
Inclusion Group, as the contracting authority, hereby provides the justification for the direct award of the contract to ECO Approach, without prior publication in the Official Journal of the European Union (OJEU) or the Find a Tender Service (FTS). This decision is made in strict accordance with the provisions of Regulation 32(3) of the Public Contracts Regulations 2015 (or the equivalent national transposition of EU Directive 2014/24/EU, as applicable), which permits the use of the negotiated procedure without prior publication for additional services by the original contractor under specific circumstances. ECO Approach is the incumbent supplier for the services in question, and our assessment, conducted under PfH's call-off procedures which permit consideration of a "lawful advantage of an incumbent Supplier," has concluded that a change of supplier would unequivocally result in considerable inconvenience and substantial duplication of costs for Inclusion Group. Specifically, our analysis has identified the following critical factors: Unavoidable Costs of Changing Supplier: Transitioning to a new supplier would necessitate significant and unavoidable financial outlays. These include, but are not limited to, the costs associated with: Extensive re-training of our staff on new systems and processes, leading to productivity losses during the transition phase. Potential investment in new or adapted infrastructure to ensure compatibility with a different supplier's operational model. The inherent administrative burden and resource allocation required for onboarding a new provider, including contract negotiation, legal reviews, and extensive due diligence processes. Potential for initial service disruption during the migration period, which could impact our residents and operational efficiency, incurring indirect costs. Lower Risks of Service Migration: The continued engagement with ECO Approach, as the incumbent, presents a demonstrably lower risk profile for service migration. ECO Approach possesses an in-depth understanding of Inclusion Group's specific operational requirements, existing infrastructure, and the unique needs of our residents. This established knowledge base mitigates the significant risks associated with: Potential delays or failures in service continuity that could arise from a new supplier's learning curve or unforeseen integration challenges. The risk of non-compliance or misinterpretation of our specific service level agreements and regulatory obligations by an unfamiliar provider. The disruption to established communication channels and working relationships that are critical for the efficient delivery of services to our vulnerable residents. Based on this thorough assessment, Inclusion Group is satisfied that the cumulative impact of these unavoidable costs and elevated risks associated with changing suppliers constitutes the "considerable inconvenience and substantial duplication of costs" as stipulated by Regulation 32(3). Therefore, to ensure the continuity of essential services, safeguard our operational integrity, and responsibly manage public funds by avoiding disproportionate expenditure and risk, the direct award of the contract to ECO Approach is deemed lawful and necessary under these exceptional circumstances.

Covered By

GPA

Legal basis

Id
32014L0024
Scheme
CELEX

Techniques

Has Framework Agreement
Yes

Classification

Id
98300000
Scheme
CPV
Description
Miscellaneous services

Procedure reasons

Entry 1
Id
D_OUTSIDE_SCOPE
Scheme
TED_PT_AWARD_CONTRACT_WITHOUT_CALL
Description
The procurement falls outside the scope of application of the directive

Lots and requirements

Entry 1
Id
1
Status
cancelled
Has Options
Yes
Description
The scope of this procurement covers the following essential services: EICR Inspections and Certification: Comprehensive Electrical Installation Condition Report inspections and subsequent certification. EPC Inspections and Certification: Energy Performance Certificate inspections and subsequent certification. All EICR and EPC inspections and certifications will be completed in line with agreed contract costs as per the asset list. The appointed supplier (ECO Approach Limited) will be responsible for ensuring the programme of inspections strives to achieve 100% compliance for both EICRs and EPCs across Inclusion Group's portfolio. Additionally, the contract outlines provisions for: Remedial Works: Works resulting from Planned Preventative Maintenance (PPM) activities that exceed a self-certification threshold (£150+) will require separate order numbers. Reactive Repairs and Improvements: Any reactive repairs and improvements will each be issued as separate orders

Options

Description
Option to extend +2 years

Award criteria

Criteria

Criterion 1
Type
price

Items and delivery

Item 1
Id
1
Related Lot
1

Delivery locations

Entry 1
Region
UKC
Entry 2
Region
UKD
Entry 3
Region
UKE
Entry 4
Region
UKF
Entry 5
Region
UKG
Entry 6
Region
UKH
Entry 7
Region
UKI
Entry 8
Region
UKJ
Entry 9
Region
UKK
Entry 10
Region
UKL
Entry 11
Region
UKM

Buyer, suppliers and contacts

Organisation 1
Id
GB-COH-12505808
Name
INCLUSION GROUP LIMITED

Roles

buyer

Address

Region
UKE21
Locality
York
Postal Code
YO317TQ
Country Name
United Kingdom
Street Address
106 Heworth Green

Details

Classifications

Entry 1
Scheme
TED_CA_TYPE
Description
Community Interest Company
Entry 2
Id
06
Scheme
COFOG
Description
Housing and community amenities

Identifier

Id
12505808
Scheme
GB-COH
Legal Name
INCLUSION GROUP LIMITED

Contact

Organisation 2
Id
GB-COH-08624580
Name
Eco Approach Limited

Roles

supplier

Address

Region
UK
Locality
Beckenham
Postal Code
BR3 1EW
Country Name
United Kingdom
Street Address
182a High Street

Details

Scale
sme

Identifier

Id
08624580
Scheme
GB-COH
Legal Name
Eco Approach Limited
Organisation 3
Id
GB-FTS-154067
Name
The High Court of Justice of England and Wales

Roles

reviewBody

Address

Locality
London
Postal Code
WC2A 2LL
Country Name
United Kingdom
Street Address
Royal Courts of Justice, Strand

Identifier

Legal Name
The High Court of Justice of England and Wales

Award information

Award 1
Id
039122-2025-1
Status
active

Suppliers

Supplier 1
Id
GB-COH-08624580
Name
Eco Approach Limited

Related lots

1

Contracts and changes

Entry 1
Id
039122-2025-1
Status
active
Award ID
039122-2025-1
Date Signed
27 Jun 2025, 00:00

Value

Amount
430,000
Currency
GBP

Recorded locations

  • Buyer location · York · UKE21 · YO317TQ · United Kingdom
  • Delivery location · UKC
  • Delivery location · UKD
  • Delivery location · UKE
  • Delivery location · UKF
  • Delivery location · UKG
  • Delivery location · UKH
  • Delivery location · UKI
  • Delivery location · UKJ
  • Delivery location · UKK
  • Delivery location · UKL
  • Delivery location · UKM

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. ocds-h6vhtk-055d4d-2025-07-11T09:21:46+01:00compiled ·