Home / Opportunities / Opportunity
PROCUREMENT OPPORTUNITY

CCTV Shared Service Control Room Upgrade

Huntingdonshire District Council · Transparency notice on Find a Tender

Tender information last checkedLast checked 30 Sept 2026, 05:29.

Opportunity overview

The CCTV Shared Service Control Room forms a critical part of our public safety and security infrastructure, operating as the central hub for live surveillance, incident response, evidentiary capture, and integration with law enforcement and emergency services. As part of its lifecycle, the control room undergoes scheduled technology refreshes approximately once every decade to remain aligned with evolving security threats, software support cycles, hardware obsolescence, and operational standards. We have reached a mandatory upgrade point driven primarily by Microsoft's transition to Windows 11, which in turn requires a concurrent upgrade of our deployed Video Management System (VMS), Veracity (iComply). This has now been Direct awarded and contracts signed after the mandatory standstill period following the Contract Award notice.

Awarded to

Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.

DSSL GROUP LIMITED

Matched by number
Published award value
£230k
Awarded
17 Jul 2025
Award ID
1
Status
active
Identifier
GB-COH 06993052
Location
Basildon, UKH37, SS13 1EU, United Kingdom

Classification

No classification was supplied.

Lots

  • Lot 1Value not stated

Documents and notices

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
C/2025/624
Status
complete
Procurement Method
direct
Procurement Method Details
Direct award
Why this procedure was chosen
1.1 Security-Sensitive Infrastructure The existing CCTV infrastructure operates within a highly secure environment that includes: • Internet Protocol (IP) based architecture across servers, switches, and camera networks. • End-to-end encrypted video transmission and data storage. • Controlled integration with police, local authority, and national security platforms. • Role-based access controls and hardened cybersecurity policies. Any modification to this architecture introduces inherent risks to system integrity, data protection, and operational resilience. The incumbent supplier holds full knowledge of the security architecture, encryption keys, firewall rules, VLAN segregation, failover protocols, and other critical system parameters. 1.2 Continuity of Service Obligations The CCTV Shared Service is a 24/7 operational environment. Any prolonged downtime or system instability during the upgrade process would: • Expose public safety risks. • Jeopardize evidential continuity for criminal investigations. • Breach legal and statutory obligations under GDPR, DPA, and surveillance codes of practice. The incumbent supplier is uniquely positioned to undertake the upgrade without disruption, leveraging their intimate familiarity with existing configurations, historical issues, and contingency protocols. 2. Incumbent-Specific Configuration & Compliance Requirements 2.1 Proprietary System Configuration The Veracity (iComply) VMS has been heavily customised over its operational life cycle, incorporating: • Custom integration with multiple third-party data feeds (ANPR, Help Points, Blue Light integration, etc.). • Bespoke alerting, audit trails, and control room user interfaces. • Unique failover and recovery protocols developed by the incumbent. Attempting to replicate or reverse-engineer these configurations via a third party would require: • Extensive reverse engineering. • Risk of misconfiguration. • Loss of undocumented institutional knowledge. 2.2 Warranty, Liability & Maintenance Conflicts • The incumbent supplier holds full responsibility for system warranties, ongoing maintenance, and post-installation support. • Introducing a third-party installer would result in split liability and non-alignment of warranty obligations. • Should technical issues arise post-upgrade, the incumbent would be contractually and commercially entitled to decline support on non-standard installations. 2.3 Regulatory & Audit Compliance The incumbent supplier maintains full compliance with external and statutory audits including SSAIB certification, which validates: • System integrity. • Data security. • Operational competence. • Resilience to cyber and physical threats. Any deviation from the incumbent's service introduces compliance risks that may trigger adverse audit findings or even operational shutdown pending rectification 3. Access to Secure Data & Controlled Environments 3.1 Access to Sensitive Information The upgrade process requires privileged access to: • Historical and live surveillance footage. • Secure server environments containing criminal investigation data. • Law enforcement integration nodes. • Critical physical access to secured data centres and control rooms. The incumbent supplier already holds the required security clearances, training, and vetted personnel approved for working within these highly restricted environments. 3.2 Contractor Vetting & Validation • Engaging new contractors would trigger extensive security vetting, vetting agency approvals, police background checks, and control room familiarisation. • This process is time-consuming, costly, and carries the risk of failed clearances, delaying the upgrade. • The incumbent's team remains fully cleared, trained, and embedded within current security protocols. 4. Market Comparison & Financial Analysis 4.1 Market Alternatives Considered A comparative market assessment was undertaken to evaluate alternative suppliers and solutions, including: • Full replacement options such as Genetec and Milestone VMS platforms. • Re-engagement with previous suppliers offering similar solutions. 4.2 Comparative Cost Analysis • A full system replacement was priced at approximately 400% higher than the incumbent's quoted costs due to hardware, licensing, integration, and training expenses. • A previous supplier's proposal was 200% more expensive than the incumbent's quote for equivalent scope. • Ancillary costs such as staff retraining, operational downtime, and interface redevelopment further inflate non-incumbent solutions. 4.3 Value for Money Conclusion The incumbent's proposal represents: • Full backward compatibility. • Minimal retraining requirements. • No service downtime. • Lowest capital and operational expenditure.

Covered By

GPA

Legal basis

Id
2023/54
Scheme
UKPGA

Procedure reasons

Entry 1
Id
additionalRepeatExtensionPartialReplacement

Lots and requirements

Entry 1
Id
1
Status
complete

Suitability

Sme
Yes

Published documents

Entry 1
Id
conflictOfInterest
Description
Not published
Document Type
conflictOfInterest

Buyer, suppliers and contacts

Organisation 1
Id
GB-PPON-PXCY-8219-LWDM
Name
Huntingdonshire District Council

Roles

buyer

Address

Region
UKH12
Country
GB
Locality
Cambridgeshire
Postal Code
PE29 3TN
Country Name
United Kingdom
Street Address
Pathfinder House St Mary's Street Huntingdon,

Details

Classifications

Entry 1
Id
publicAuthoritySubCentralGovernment
Scheme
UK_CA_TYPE
Description
Public authority - sub-central government

Identifier

Id
PXCY-8219-LWDM
Scheme
GB-PPON

Contact

Organisation 2
Id
GB-COH-6993052
Name
DSSL Group Ltd

Roles

supplier

Address

Region
UKH37
Country
GB
Locality
Basildon
Postal Code
SS13 1EU
Country Name
United Kingdom
Street Address
1-3 Britannia Court, Burnt Mills Industrial Estate, Basildon, ESX, SS13 1EU, United Kingdom

Details

Vcse
No
Scale
sme

Identifier

Id
6993052
Scheme
GB-COH

Contact

Additional Identifiers

Entry 1
Id
PNWG-7295-ZPZH
Scheme
GB-PPON
Organisation 3
Id
GB-COH-06993052
Name
DSSL GROUP LIMITED

Roles

supplier

Address

Region
UKH37
Country
GB
Locality
Basildon
Postal Code
SS13 1EU
Country Name
United Kingdom
Street Address
1-3 Britannia Court

Details

Vcse
No
Scale
sme
Sheltered Workshop
No
Public Service Mission Organization
No

Identifier

Id
06993052
Scheme
GB-COH

Contact

Additional Identifiers

Entry 1
Id
PLTX-4334-WQWT
Scheme
GB-PPON

Award information

Award 1
Id
1
Date
18 Jul 2025, 00:00
Title
CCTV shared control room upgrade award to DSSL Group Ltd
Status
active
Above Threshold
Yes
Main Procurement Category
services

Items

Item 1
Id
1
Related Lot
1

Delivery locations

Entry 1
Region
UKH1
Country
GB
Country Name
United Kingdom
Entry 2
Region
UKH12
Country
GB
Country Name
United Kingdom
Entry 3
Region
UKH12
Country
GB
Country Name
United Kingdom

Additional Classifications

Entry 1
Id
50324100
Scheme
CPV
Description
System maintenance services

Value

Amount
230,000
Currency
GBP
Including VAT
276,000

Documents

Entry 1
Id
038251-2025
Format
text/html
Notice Type
UK5
Description
Transparency notice on Find a Tender
Document Type
awardNotice
Published
8 Jul 2025, 13:55
Entry 2
Id
041553-2025
Format
text/html
Notice Type
UK6
Description
Contract award notice on Find a Tender
Document Type
awardNotice
Published
21 Jul 2025, 11:10

Suppliers

Supplier 1
Id
GB-COH-6993052
Name
DSSL Group Ltd
Supplier 2
Id
GB-COH-06993052
Name
DSSL GROUP LIMITED

Milestones

Entry 1
Id
1
Type
futureSignatureDate
Status
scheduled
Due
1 Aug 2025, 23:59

Related lots

1

Contract period

Ends
1 Oct 2025, 23:59
Starts
2 Aug 2025, 00:00

Standstill Period

Ends
30 Jul 2025, 23:59

Contracts and changes

Entry 1
Id
1
Title
CCTV shared control room upgrade award to DSSL Group Ltd
Status
active
Award ID
1
Date Signed
28 Jul 2025, 00:00
Above Threshold
Yes

Value

Amount
230,000
Currency
GBP
Including VAT
276,000

Period

Ends
1 Oct 2025, 23:59
Starts
2 Aug 2025, 00:00

Documents

Entry 1
Id
046689-2025
Format
text/html
Notice Type
UK7
Description
Contract details notice on Find a Tender
Document Type
contractNotice
Published
6 Aug 2025, 16:53

Agreed Metrics

Entry 1
Id
1
Title
On-time Delivery Rate
Entry 2
Id
2
Title
Downtime / Service Interruption
Entry 3
Id
3
Title
Compliance with Technical Standards

Recorded locations

  • Buyer location · Cambridgeshire · UKH12 · PE29 3TN · United Kingdom

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. ocds-h6vhtk-055b2a-2025-08-06T16:53:58+01:00Transparency notice on Find a Tender ·