Opportunity overview
The existing boilers, shunt pump, circuit pumps, controls and F&E tank are to be stripped out and the pipework is stripped back to a prior to it exiting the boiler room. The boilers are replaced with two new wall mounted boilers, the flues with the boilers are concentric so can terminate through the boiler room roof.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
D H Potter Construction Limited
- Published award value
- Value not stated
- Awarded
- Not supplied
- Contract signed
- 10 Jun 2025
- Award ID
- 1
- Status
- active
- Location
- Hartlepool, UKC11, TS24 7HH, United Kingdom
Classification
No classification was supplied.
Lots
- Lot 1Value not stated
Documents and notices
- Contract details notice on Find a TenderOpen source ↗