Opportunity overview
The ISO 11 Incinerator was installed within the "Postmortem - Incinerator" (PMINCIN) building circa 1994/95 and much of the original plant remaining has now reached the end of its lifecycle. Following a period of unreliability throughout 2021, and the outcome of a Hazard and Operability (HAZOP) study during April 2022, the ISO 11 10-year life extension project was initiated, which has been approximately 50% delivered to date. Work Package 2: Control Panel replacement is currently in the design phase and a detailed design has been produced and the required Control HAZOP (CHAZOP study) completed for the proposed design.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Lührfilter GB Ltd
- Published award value
- Value not stated
- Awarded
- Not supplied
- Contract signed
- 14 May 2025
- Award ID
- 1
- Status
- active
- Location
- Burntwood, UKG24, WS7 3GG, United Kingdom
Classification
No classification was supplied.
Lots
- Lot 1Value not stated
Documents and notices
- Contract details notice on Find a TenderOpen source ↗