Opportunity overview
Terrazzo Flooring Replacement Works at LNER managed stations on the East Coast Mainline route. This project will be to replace the current terrazzo flooring areas at Darlington, Newcastle, York stations (and an option to also roll-out to Doncaster station if budgets allow) with suitable and safer flooring material. Newcastle, Darlington and York Stations have been responsible for 232 public accidents over the last three years (as of 02/10/24). These three stations contribute to around 60% of the FWI across all public accidents at LNER over the same three years. A significant proportion of these accidents are caused by Terrazzo tiles which 'sweat' during dry and wet weather and perform poorly when contaminated by rainwater or spills. A tender or packages of tenders shall be published following the design stages being completed during the rest of 2025.
Classification
- CPV45000000 — Construction work
Lots
- Lot 1Value not stated
Documents and notices
- Pipeline notice on Find a TenderOpen source ↗