Opportunity overview
Our Lady of Peace is a two–form entry Primary School with Nursery provision. The school is a Catholic Voluntary Aided school within the Diocese of Northampton and has close links with the Parish of Our Lady of Peace Church in Burnham. SBC is looking to split the primary school site into two, creating two school sites instead of one. There are currently 2 main school blocks on the site (as well as various other smaller buildings). The main southern block, smaller buildings and playing fields will house the school currently using the whole site. Therefore, OLOP will go from occupying both main blocks to using only one to the south. The vacated block, to the north will be converted for use by a special educational needs school as a satellite provision. The high level brief of works to be carried out have been agreed with the schools and are set out in this document. The works will be split into phases, those that are required to get the two schools open and operational for 28th August 2025 (Our Lady of Peace) and 30th November 2025 (Arbour Vale Satellite school).
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Feltham Construction Ltd
- Contract value
- £751.8k
- Awarded
- Not supplied
- Contract signed
- 30 Jul 2025
- Including VAT
- £902.2k
- Award ID
- 1
- Status
- active
- Location
- Newbury, UKJ11, RG14 1LA, United Kingdom
Classification
- CPV45000000 — Construction work
Lots
- Lot LOT-0001AED 600k · Source currency differs from tender
Documents and notices
- Contract details notice on Find a TenderOpen source ↗
- Tender notice on Find a TenderOpen source ↗