Opportunity overview
Mirion to attend site on an annual basis to carry out annual maintenance to the B80 & B33 CID System following the requirements in the Annual Maintenance Test Document as follows: • Section 1.9 Visual Inspection. • Section 2 Input Testing • Section 3 Output Testing • Section 4 Diagnostics, 4.1, 4.2, 4.3, 4.4 (full subset) • Section 5 CEU Equipment Field Connection Listings. • Section 6 Signal Flow Test • Section 7 System Operating Parameters, 7.1, 7.2, 7.3, 7.4 Additional the following tests/maintenance to be included to ensure compliance with ES-1-2501-1 • Cleaning of all heat sinks, filters and vents in the CID panel. Documentation to be provided by the contractor to include as a minimum detailed Method Statement or Maintenance Instruction, Risk Assessment detailing all of the work to be carried out. 2). Mirion to attend site to repair any faults that the “in house” craft/engineering teams cannot support within 48 hours
Classification
No classification was supplied.
Lots
- Lot 1Value not stated
Documents and notices
- Transparency notice on Find a TenderOpen source ↗