Opportunity overview
The Ministry of Defence (the Authority) under the Materiel Distribution Land (MDL) programme is developing a requirement project for Heavy Equipment Transporter (HET) platform. Initially circa 70 to 90 vehicles with an integrated support solution service for an initial period of ten years, with potential options to increase the acquisition volume and extend beyond the initial support period. Aspirational Full Operating Capability (FOC) is June 2029. This requirement aims to introduce a new, technologically advanced system for the delivery of heavy and out-of-gauge equipment, with a minimum threshold of eighty-five (85) metric tonnes, featuring improved low mobility lift capabilities. This system will significantly improve and sustain the operational movement of heavy, mission-critical equipment well into the future. The primary role is to transport heavy armoured equipment, including armoured fighting vehicles (AFVs) and main battle tank (MBT), but it must also be capable of moving lighter equipment into the theatre of operations. Additionally, this equipment will be used during peacetime for training delivery both in the UK and overseas. A PIN has previously been released for this requirement reference 2025/S 000-002913.
Classification
- CPV34000000 — Transport equipment and auxiliary products to transportation
Lots
- Lot 1Value not stated
Documents and notices
- Preliminary market engagement notice on Find a TenderOpen source ↗
- Pipeline notice on Find a TenderOpen source ↗
- Preliminary market engagement notice on Find a TenderOpen source ↗
- Preliminary market engagement notice on Find a TenderOpen source ↗
- Preliminary market engagement notice on Find a TenderOpen source ↗