The Strathy Wood Windfarm Connection project proposes the establishment of a 132/33kV substation to allow the connection of the Strathy Wood windfarm on the network. The proposed substation is to have a single 132/33kV 90 MVA transformer (GT1) bay established at the windfarm with associated switchgears. The Strathy South project proposes the establishment of a 132/33kV substation to allow the connection of the Strathy South windfarm on the network. The proposed substation is to have a two 132/33kV 120 MVA transformer (GT1 & GT2) bays established at the windfarm with associated switchgears.
Classification
- CPV45231400 — Construction work for electricity power lines
- CPV65310000 — Electricity distribution
Lots
- The Strathy Wood Windfarm Connection project proposes the establishment of a 132/33kV substation to allow the connection of the Strathy Wood windfarm on the network. The proposed substation is to have a single 132/33kV 90 MVA transformer (GT1) bay established at the windfarm with associated switchgears. The Strathy South project proposes the establishment of a 132/33kV substation to allow the connection of the Strathy South windfarm on the network. The proposed substation is to have a two 132/33kV 120 MVA transformer (GT1 & GT2) bays established at the windfarm with associated switchgears.Value not stated