Opportunity overview

Phase 1 – Pre-Construction Services (RIBA Stage 4) The initial appointment will be for the pre-construction services, which encompass the completion of RIBA Stage 4 (Technical Design). The contractor will be responsible for providing detailed input on the buildability of the design, collaborating with the design team to ensure constructability, and contributing to cost estimation, planning, and risk identification during this phase. Key Responsibilities for RIBA Stage 4: • Provide buildability input to ensure the design can be practically constructed and meets the required performance specifications. • Assist with detailed cost estimation, including providing open book pricing. • Contribute to risk management by identifying potential risks and proposing mitigation strategies. • Review and validate the design to confirm that it aligns with project requirements and is feasible for construction. Page 4 to 10 Phase 2 – Construction Works (RIBA Stage 5 and 6) The ITT also includes the potential for the appointed Contractor to undertake the construction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover and Close Out). However, the appointment for these stages is not guaranteed at this point. Upon the completion of RIBA Stage 4, a formal review will be conducted to assess the Contractor’s performance and the project’s requirements. The Council reserves the right to proceed with the contractor for the construction works, subject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall project alignment. A break clause will be in place, allowing the Council to either proceed with the appointed Contractor or re-tender for the construction works. The Council retains Intellectual Property over full design work specific to the sites of this project for use with another contractor if required. Key Points for RIBA Stage 5 and 6: • The ITT outlines the requirements for both pre-construction services and potential construction works, but the contractor is only guaranteed the work for RIBA Stage 4. • Following the completion of RIBA Stage 4, the Council will review whether to appoint the contractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations. The main contract is subject to obtaining all necessary planning consents. The responsibility for securing these consents will primarily rest with the Council. However, the appointed contractor will be expected to provide technical support and relevant information as required during the planning process. The contractor must be aware that no construction works, particularly any equipment ordering or significant on-site activities, can commence until all planning permissions are secured. The timeline for the project may be extended if planning approvals are delayed. Coordination with external parties, may also impact the timing of planning approvals and should be factored into the project delivery plan. The project is partially funded through the Public Sector Decarbonisation Scheme (PSDS), and the key funding condition is that the project must be fully delivered, reach Practical Completion (PC), and be signed off by the end of January 2026. This is the final deadline for the project, and all works must be completed, tested, commissioned, and handed over before this date to ensure compliance with funding requirements. While an initial target of December 2025 has been identified for completion, this is flexible to avoid unnecessary risk. The Council prefers to extend the timeline if required to ensure quality and performance, rather than rush delivery.

Awarded to

Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.

Alternative Heat Ltd

Matched by exact name
Contract value
£2.9m
Awarded
Not supplied
Contract signed
6 Jul 2025
Award ID
037694-2025-1
Status
active
Location
Banbridge, UK, United Kingdom

Classification

  • CPV45000000 — Construction work

Lots

  • Phase 1 – Pre-Construction Services (RIBA Stage 4) The initial appointment will be for the pre-construction services, which encompass the completion of RIBA Stage 4 (Technical Design). The contractor will be responsible for providing detailed input on the buildability of the design, collaborating with the design team to ensure constructability, and contributing to cost estimation, planning, and risk identification during this phase. Key Responsibilities for RIBA Stage 4: • Provide buildability input to ensure the design can be practically constructed and meets the required performance specifications. • Assist with detailed cost estimation, including providing open book pricing. • Contribute to risk management by identifying potential risks and proposing mitigation strategies. • Review and validate the design to confirm that it aligns with project requirements and is feasible for construction. Page 4 to 10 Phase 2 – Construction Works (RIBA Stage 5 and 6) The ITT also includes the potential for the appointed Contractor to undertake the construction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover and Close Out). However, the appointment for these stages is not guaranteed at this point. Upon the completion of RIBA Stage 4, a formal review will be conducted to assess the Contractor’s performance and the project’s requirements. The Council reserves the right to proceed with the contractor for the construction works, subject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall project alignment. A break clause will be in place, allowing the Council to either proceed with the appointed Contractor or re-tender for the construction works. The Council retains Intellectual Property over full design work specific to the sites of this project for use with another contractor if required. Key Points for RIBA Stage 5 and 6: • The ITT outlines the requirements for both pre-construction services and potential construction works, but the contractor is only guaranteed the work for RIBA Stage 4. • Following the completion of RIBA Stage 4, the Council will review whether to appoint the contractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations. The main contract is subject to obtaining all necessary planning consents. The responsibility for securing these consents will primarily rest with the Council. However, the appointed contractor will be expected to provide technical support and relevant information as required during the planning process. The contractor must be aware that no construction works, particularly any equipment ordering or significant on-site activities, can commence until all planning permissions are secured. The timeline for the project may be extended if planning approvals are delayed. Coordination with external parties, may also impact the timing of planning approvals and should be factored into the project delivery plan. The project is partially funded through the Public Sector Decarbonisation Scheme (PSDS), and the key funding condition is that the project must be fully delivered, reach Practical Completion (PC), and be signed off by the end of January 2026. This is the final deadline for the project, and all works must be completed, tested, commissioned, and handed over before this date to ensure compliance with funding requirements. While an initial target of December 2025 has been identified for completion, this is flexible to avoid unnecessary risk. The Council prefers to extend the timeline if required to ensure quality and performance, rather than rush delivery.£3.2m

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
DN752184
Status
complete
Has Recurrence
No
Procurement Method
open
Main Procurement Category
works
Procurement Method Details
Open procedure

Covered By

GPA

Bid Opening

Date
13 Mar 2025, 12:05

Legal basis

Id
32014L0024
Scheme
CELEX

Expected award period

Starts
13 Mar 2025, 12:05

Tender Period

Ends
13 Mar 2025, 12:00

Classification

Id
45000000
Scheme
CPV
Description
Construction work

Submission terms

Languages

en

Submission Method

electronicSubmission

Lots and requirements

Entry 1
Id
1
Status
cancelled
Has Options
No
Has Renewal
No
Description
Phase 1 – Pre-Construction Services (RIBA Stage 4) The initial appointment will be for the pre-construction services, which encompass the completion of RIBA Stage 4 (Technical Design). The contractor will be responsible for providing detailed input on the buildability of the design, collaborating with the design team to ensure constructability, and contributing to cost estimation, planning, and risk identification during this phase. Key Responsibilities for RIBA Stage 4: • Provide buildability input to ensure the design can be practically constructed and meets the required performance specifications. • Assist with detailed cost estimation, including providing open book pricing. • Contribute to risk management by identifying potential risks and proposing mitigation strategies. • Review and validate the design to confirm that it aligns with project requirements and is feasible for construction. Page 4 to 10 Phase 2 – Construction Works (RIBA Stage 5 and 6) The ITT also includes the potential for the appointed Contractor to undertake the construction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover and Close Out). However, the appointment for these stages is not guaranteed at this point. Upon the completion of RIBA Stage 4, a formal review will be conducted to assess the Contractor’s performance and the project’s requirements. The Council reserves the right to proceed with the contractor for the construction works, subject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall project alignment. A break clause will be in place, allowing the Council to either proceed with the appointed Contractor or re-tender for the construction works. The Council retains Intellectual Property over full design work specific to the sites of this project for use with another contractor if required. Key Points for RIBA Stage 5 and 6: • The ITT outlines the requirements for both pre-construction services and potential construction works, but the contractor is only guaranteed the work for RIBA Stage 4. • Following the completion of RIBA Stage 4, the Council will review whether to appoint the contractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations. The main contract is subject to obtaining all necessary planning consents. The responsibility for securing these consents will primarily rest with the Council. However, the appointed contractor will be expected to provide technical support and relevant information as required during the planning process. The contractor must be aware that no construction works, particularly any equipment ordering or significant on-site activities, can commence until all planning permissions are secured. The timeline for the project may be extended if planning approvals are delayed. Coordination with external parties, may also impact the timing of planning approvals and should be factored into the project delivery plan. The project is partially funded through the Public Sector Decarbonisation Scheme (PSDS), and the key funding condition is that the project must be fully delivered, reach Practical Completion (PC), and be signed off by the end of January 2026. This is the final deadline for the project, and all works must be completed, tested, commissioned, and handed over before this date to ensure compliance with funding requirements. While an initial target of December 2025 has been identified for completion, this is flexible to avoid unnecessary risk. The Council prefers to extend the timeline if required to ensure quality and performance, rather than rush delivery.

Value

Amount
3,200,000
Currency
GBP

Award criteria

Criteria

Criterion 1
Name
Quality
Type
quality
Description
60
Criterion 2
Name
Social Value
Type
quality
Description
10
Criterion 3
Type
price
Description
30

Contract period

Duration In Days
360

Submission terms

Variant Policy
allowed

Items and delivery

Item 1
Id
1
Related Lot
1

Delivery locations

Entry 1
Region
UK
Entry 2
Region
UK

Buyer, suppliers and contacts

Organisation 1
Id
GB-FTS-66532
Name
Lancaster City Council

Roles

buyer

Address

Region
UK
Locality
Lancaster
Postal Code
LA1 1PJ
Country Name
United Kingdom
Street Address
Lancaster Town Hall, Dalton Square

Details

Classifications

Entry 1
Id
REGIONAL_AUTHORITY
Scheme
TED_CA_TYPE
Description
Regional or local authority
Entry 2
Id
01
Scheme
COFOG
Description
General public services

Identifier

Legal Name
Lancaster City Council

Contact

Name
Dr Robert Boschi
Telephone
+44 1524582000
Organisation 2
Id
GB-FTS-4274
Name
Lancaster City Council

Roles

reviewBody

Address

Locality
Lancaster
Postal Code
LA1 1PJ
Country Name
United Kingdom

Identifier

Legal Name
Lancaster City Council
Organisation 3
Id
GB-FTS-4273
Name
Lancaster City Council

Roles

buyer

Address

Region
UK
Locality
Lancaster
Postal Code
LA1 1PJ
Country Name
United Kingdom
Street Address
Town Hall, Dalton Square

Details

Classifications

Entry 1
Id
REGIONAL_AUTHORITY
Scheme
TED_CA_TYPE
Description
Regional or local authority
Entry 2
Id
01
Scheme
COFOG
Description
General public services

Identifier

Legal Name
Lancaster City Council

Contact

Name
Mr Justin Shaw
Telephone
+44 1524582375
Organisation 4
Id
GB-FTS-114021
Name
Alternative Heat Ltd

Roles

supplier

Address

Region
UK
Locality
Banbridge
Country Name
United Kingdom

Details

Scale
large

Identifier

Legal Name
Alternative Heat Ltd
Organisation 5
Id
GB-FTS-10477
Name
Lancaster City Council

Roles

reviewBody

Address

Locality
Lancaster
Country Name
United Kingdom

Identifier

Legal Name
Lancaster City Council

Award information

Award 1
Id
037694-2025-1
Status
active

Suppliers

Supplier 1
Id
GB-FTS-114021
Name
Alternative Heat Ltd

Related lots

1

Contracts and changes

Entry 1
Id
037694-2025-1
Status
active
Award ID
037694-2025-1
Date Signed
7 Jul 2025, 00:00

Value

Amount
2,937,317
Currency
GBP

Recorded locations

  • Buyer location · Lancaster · UK · LA1 1PJ · United Kingdom
  • Delivery location · UK

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. ocds-h6vhtk-04e7c4-2025-07-07T11:30:28+01:00compiled ·