Opportunity overview
LLA require a Design and build contractor to refurbish Hangars 9 60 and 127. Following Monarch Aircraft Engineering Limited - MAEL- entering into administration, LLA agreed the transfer and agreement for sale to take back possession of Hangar 9 Hangar 60 and Hangar 127 in Feb-2024. It is intended to re-lease H60 and H127 to airlines operating at the airport to use as Maintenance Repair and Operation Centres -MRO. The works are for the complete refurbishment of all three Hangars H9 H60 and H127 to create two fully operational maintenance hangars and a Consolidation Centre. Note the works to the maintenance hangars will include both CAT A and CAT B works. The proposed works to Hangar 9 will only be CAT A works. More details can be found within the tender document pack
Classification
- CPV45453100 — Refurbishment work
- CPV44200000 — Structural products
- CPV45000000 — Construction work
- CPV45100000 — Site preparation work
- CPV45200000 — Works for complete or part construction and civil engineering work
- CPV45212000 — Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
- CPV45300000 — Building installation work
- CPV45310000 — Electrical installation work
- CPV45311100 — Electrical wiring work
- CPV45320000 — Insulation work
- CPV45330000 — Plumbing and sanitary works
- CPV45350000 — Mechanical installations
- CPV45400000 — Building completion work
- CPV45410000 — Plastering work
Lots
- LLA require a Design and build contractor to refurbish Hangars 9 60 and 127. Please see tender documents for details. Additional information: Please see tender documents for full details£8m