Opportunity overview
The aim of this procurement is to deliver works to refurbish the synthetic rooftop pitches at Mile End Park Leisure Centre. This is to ensure they meet safety, performance, and quality standards so they can provide a durable, high-quality surface that supports football activities for long-term use.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
ETC Sports Surfaces Limited
Matched by normalised name
- Contract value
- £424.4k
- Awarded
- Not supplied
- Contract signed
- 7 Sept 2025
- Award ID
- 059535-2025-CO6050-1
- Status
- active
- Location
- Witham, UKI, CM8 3YU, United Kingdom
Classification
- CPV45000000 — Construction work
Lots
- The London Borough of Tower Hamlets is seeking a contractor to refurbish and modernise the seven artificial pitches on the rooftop of Mile End Park Leisure Centre. This is to ensure they meet safety, performance, and quality standards so they can provide a durable, high-quality surface that supports football activities for long-term use. The refurbishment will include the installation of new fencing system, installation of new synthetic turf surfacing system (reduced SBR type system,) installation of new infill migration mitigation features and installation of new goals. Tower Hamlets requires some areas to be left open so that the site can continue to host fixtures during the works period, and there is a need to ensure the programme reflects an ability to ensure some pitches are always open for users of the facility. It is therefore proposed that the works are undertaken in the following order: Pitches 3, 4, 5, 6, 7, 9, 10 are refurbished first, leaving pitches 1, 2 and 8 in operation by the facility. When handover occurs on the refurbished pitches, these become operational and then Pitches 1, 2 and 8 are subsequently refurbished. This would minimise disruption to playing provision on the site and allow the area to start being used following completion whilst the other pitches are continued to be refurbished. The Contractor should therefore return a cost / programme with this outlined as to how this could be realised in practicality.Value not stated